{"title":"The LEB To MEB Transfer Kicker System Prototype","authors":"C. Pappas, M. Wilson, D. Anderson","doi":"10.1109/MODSYM.1994.597063","DOIUrl":null,"url":null,"abstract":"The design requirements for the Low Energy Booster (LEB) extraction kicker system at the Superconducting Super Collider Laboratory (SSCL) were to deflect a 12 GeV/c beam through an angle of 1.5 mrad. The circumference of the LEB was 540 M. This resulted in a 0.06 T-m integrated field, of 1.8 {mu}s width with a 1% to 99% rise time of less than 80 ns and allowable pulse ripple of less than {plus_minus}1%. The repetition frequency was 10 Hz and the allowable timing jitter was 2 ns. The field was required to be uniform over a 2{times}4 cm area to {plus_minus}2.5%. The requirements for the Medium Energy Booster (MEB) injection kicker were similar except that a 99% to 1% pulse fall time of less than 2 {mu}s was needed. Prototypes of the pulsed power system and magnet to meet these requirements were built and tested at the SSCL. This paper describes the results of that testing.","PeriodicalId":330796,"journal":{"name":"Twenty-First International Power Modulator Symposium, Conference","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Twenty-First International Power Modulator Symposium, Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MODSYM.1994.597063","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The design requirements for the Low Energy Booster (LEB) extraction kicker system at the Superconducting Super Collider Laboratory (SSCL) were to deflect a 12 GeV/c beam through an angle of 1.5 mrad. The circumference of the LEB was 540 M. This resulted in a 0.06 T-m integrated field, of 1.8 {mu}s width with a 1% to 99% rise time of less than 80 ns and allowable pulse ripple of less than {plus_minus}1%. The repetition frequency was 10 Hz and the allowable timing jitter was 2 ns. The field was required to be uniform over a 2{times}4 cm area to {plus_minus}2.5%. The requirements for the Medium Energy Booster (MEB) injection kicker were similar except that a 99% to 1% pulse fall time of less than 2 {mu}s was needed. Prototypes of the pulsed power system and magnet to meet these requirements were built and tested at the SSCL. This paper describes the results of that testing.