{"title":"Integrated order acceptance and production scheduling with lead time flexibility","authors":"Ding Wen-ying, Zhou Hui-Xiu, He Ke-tai","doi":"10.1109/ICIEA.2017.8283049","DOIUrl":null,"url":null,"abstract":"Order acceptance and production scheduling problem is important in manufacturing industries with limited capacity and many coming orders. In this study, we considered the leadtime flexibility of manufacturers which include setting a due date time window to deliver goods, producing products early before customers' orders arrive or are committed, and completing customers' orders after the agreed due dates. Furthermore, a parameter of importance of order is defined to verify different degree of customers.","PeriodicalId":443463,"journal":{"name":"2017 12th IEEE Conference on Industrial Electronics and Applications (ICIEA)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 12th IEEE Conference on Industrial Electronics and Applications (ICIEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEA.2017.8283049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Order acceptance and production scheduling problem is important in manufacturing industries with limited capacity and many coming orders. In this study, we considered the leadtime flexibility of manufacturers which include setting a due date time window to deliver goods, producing products early before customers' orders arrive or are committed, and completing customers' orders after the agreed due dates. Furthermore, a parameter of importance of order is defined to verify different degree of customers.