Data structures and simulation algorithms for flow-shop scheduling with resource availability constraints

Levente Fazekas, G. Kulcsár
{"title":"Data structures and simulation algorithms for flow-shop scheduling with resource availability constraints","authors":"Levente Fazekas, G. Kulcsár","doi":"10.32968/psaie.2022.1.3.","DOIUrl":null,"url":null,"abstract":"Flow-shop scheduling problems are classic examples of multi-resource and multi-operation optimization problems. This paper demonstrates our model and simulation for solving Flow-shop scheduling optimization problems with resource availability constraints to minimize makespan. Working hours, transfer times and setup times are taken into account. Working hours could be interpreted in two ways. In the first option, operations must fit into a single available time slot. In the second option, the simulation could cut operations across multiple time slots. We propose a simulation algorithm that accounts for both scenarios and could be used with any permutation-based exact, heuristic, or search algorithm.","PeriodicalId":117509,"journal":{"name":"Production Systems and Information Engineering","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Systems and Information Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32968/psaie.2022.1.3.","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Flow-shop scheduling problems are classic examples of multi-resource and multi-operation optimization problems. This paper demonstrates our model and simulation for solving Flow-shop scheduling optimization problems with resource availability constraints to minimize makespan. Working hours, transfer times and setup times are taken into account. Working hours could be interpreted in two ways. In the first option, operations must fit into a single available time slot. In the second option, the simulation could cut operations across multiple time slots. We propose a simulation algorithm that accounts for both scenarios and could be used with any permutation-based exact, heuristic, or search algorithm.
具有资源可用性约束的流水车间调度的数据结构和仿真算法
流水车间调度问题是多资源、多作业优化问题的典型例子。本文给出了求解具有资源可用性约束的流水车间调度优化问题的模型和仿真。工作时间,转移时间和设置时间被考虑在内。工作时间可以用两种方式解释。在第一个选项中,操作必须适合于单个可用的时隙。在第二个选项中,模拟可以跨多个时间段减少操作。我们提出了一种模拟算法,该算法考虑了这两种情况,并且可以与任何基于排列的精确、启发式或搜索算法一起使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信