{"title":"ANALISA TRANSFORMASI GELOMBANG PADA BREAKWATER DI PLTU KARANGKANDRI CILACAP","authors":"Indiarto Indiarto, Rifki Aji Ramadhan, Novi Andhi Setyo Purwono, Iwan Rustendi","doi":"10.53810/jt.v21i2.368","DOIUrl":null,"url":null,"abstract":"Â ABSTRACTÂ PLTU Cilacap is the only power plant that operates on the southern part of Java Island and is interconnected with the Java-Bali system. Precisely located in the village of Karangkandri, Kesugihan district, Cilacap Regency, 20 kilometers from the city of Cilacap. The Cilacap power plant has a breakwater building that serves to dampen incoming waves and provide protection against damage to the area around the power plant where its effectiveness depends on the placement of the direction of the breakwater. The purpose of writing this Final Project is to analyze the characteristics of the wave transformation and evaluate the performance of breakwater in the PLTU Karangkandri Cilacap. The data used include: Bathymetric Data, Wind Data for 10 years, and Location Maps. The method used in the analysis of wind data for 10 years to calculate the return wave is the SMB method consisting of Weibull and Gumbel (Fisher-Tippet Type I), as well as the wave simulation using Sofware SMS 8.0 CG Wave models.From the results of wind data analysis for 10 years that the dominant wind direction comes from the Southeast with an average speed distribution of 3.73 m / s with the longest effective fetch of 160.41 km. The analysis of wave rose shows that August is the month where wave height reaches its highest point with a significant wave height for 10 years of 3.757 m. Based on the main point of view on the CG Wave simulation, the results obtained a large percentage of the wave height from the south, southeast and east after the breakwater is between 1.37% - 8.71% and the percentage of wave height without breakwater is between 98.63% - 117.28%. The greater the percentage of the wave height, the greater the wave height that occurs so that it can affect the effectiveness of the mouth of the Breakwater, so that the breakwater model is still effective and safe for driving the wave speed.Keywords: PLTU Cilacap Breakwater, Weibull Method, Gumbel Method (Fisher-Tippet Type I), CG WaveINTISARIÂ PLTU Cilacap merupakan satu-satunya pembangkit yang beroperasi di pulau jawa bagian selatan dan terinterkoneksi dengan sistem jawa-bali. Tepatnya terletak di desa Karangkandri, kecamatan Kesugihan, Kabupaten Cilacap, 20 kilometer dari kota Cilacap. PLTU Cilacap memiliki bangunan breakwater yang berfungsi untuk meredam gelombang yang datang dan memberikan perlindungan terhadap kerusakan wilayah disekitar PLTU dimana keefektifannya bergantung pada penempatan arah breakwater. Tujuan dari penulisan Tugas Akhir ini adalah menganalisis karakteristik transformasi gelombang dan mengevaluasi kinerja breakwater di PLTU Karangkandri Cilacap. Data yang digunakan antara lain : Data Batimetri, Data Angin selama 10 tahun, dan Peta Lokasi. Metode yang digunakan dalam analisis data angin selama 10 tahun untuk menghitung gelombang kala ulang adalah metode SMB yang terdiri dari Weibull dan Gumbel (Fisher-Tippet Type I), serta simulasi gelombangnya menggunakan Sofware SMS 8.0 model CG Wave.Dari hasil analisis data angin selama 10 tahun bahwa arah angin dominan berasal dari arah Tenggara dengan kecepatan rata-rata distribusi frekuensi sebesar 3,73 m/s dengan fetch efektif terpanjang sebesar 160,41 km. Hasil analisis mawar gelombang (Waverose) didapatkan bahwa bulan Agustus merupakan bulan dimana tinggi gelombang mencapai titik tertingginya dengan tinggi gelombang signifikan selama 10 tahun sebesar 3,757 m. Berdasarkan titik tinjauan utama pada simulasi CG Wave didapatkan hasil persentase besar terjadinya tinggi gelombang dari arah selatan, tenggara dan timur setelah adanya breakwater adalah sebesar antara 1,37% - 8,71% dan persentase tinggi gelombang tanpa breakwater sebesar antara 98,63% - 117,28%. Semakin besar persentase tinggi gelombangnya maka semakin besar tinggi gelombang yang terjadi sehingga dapat mempengaruhi keefektifan mulut Breakwater tersebut, sehingga model breakwater tersebut masih efektif dan aman untuk menghalau laju gelombang.Kata Kunci: Breakwater PLTU Cilacap, Metode Weibull, Metode Gumbel (Fisher-Tippet Type I), CG Wave","PeriodicalId":119312,"journal":{"name":"Teodolita: Media Komunkasi Ilmiah di Bidang Teknik","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-02-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teodolita: Media Komunkasi Ilmiah di Bidang Teknik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53810/jt.v21i2.368","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
 ABSTRACT PLTU Cilacap is the only power plant that operates on the southern part of Java Island and is interconnected with the Java-Bali system. Precisely located in the village of Karangkandri, Kesugihan district, Cilacap Regency, 20 kilometers from the city of Cilacap. The Cilacap power plant has a breakwater building that serves to dampen incoming waves and provide protection against damage to the area around the power plant where its effectiveness depends on the placement of the direction of the breakwater. The purpose of writing this Final Project is to analyze the characteristics of the wave transformation and evaluate the performance of breakwater in the PLTU Karangkandri Cilacap. The data used include: Bathymetric Data, Wind Data for 10 years, and Location Maps. The method used in the analysis of wind data for 10 years to calculate the return wave is the SMB method consisting of Weibull and Gumbel (Fisher-Tippet Type I), as well as the wave simulation using Sofware SMS 8.0 CG Wave models.From the results of wind data analysis for 10 years that the dominant wind direction comes from the Southeast with an average speed distribution of 3.73 m / s with the longest effective fetch of 160.41 km. The analysis of wave rose shows that August is the month where wave height reaches its highest point with a significant wave height for 10 years of 3.757 m. Based on the main point of view on the CG Wave simulation, the results obtained a large percentage of the wave height from the south, southeast and east after the breakwater is between 1.37% - 8.71% and the percentage of wave height without breakwater is between 98.63% - 117.28%. The greater the percentage of the wave height, the greater the wave height that occurs so that it can affect the effectiveness of the mouth of the Breakwater, so that the breakwater model is still effective and safe for driving the wave speed.Keywords: PLTU Cilacap Breakwater, Weibull Method, Gumbel Method (Fisher-Tippet Type I), CG WaveINTISARI PLTU Cilacap merupakan satu-satunya pembangkit yang beroperasi di pulau jawa bagian selatan dan terinterkoneksi dengan sistem jawa-bali. Tepatnya terletak di desa Karangkandri, kecamatan Kesugihan, Kabupaten Cilacap, 20 kilometer dari kota Cilacap. PLTU Cilacap memiliki bangunan breakwater yang berfungsi untuk meredam gelombang yang datang dan memberikan perlindungan terhadap kerusakan wilayah disekitar PLTU dimana keefektifannya bergantung pada penempatan arah breakwater. Tujuan dari penulisan Tugas Akhir ini adalah menganalisis karakteristik transformasi gelombang dan mengevaluasi kinerja breakwater di PLTU Karangkandri Cilacap. Data yang digunakan antara lain : Data Batimetri, Data Angin selama 10 tahun, dan Peta Lokasi. Metode yang digunakan dalam analisis data angin selama 10 tahun untuk menghitung gelombang kala ulang adalah metode SMB yang terdiri dari Weibull dan Gumbel (Fisher-Tippet Type I), serta simulasi gelombangnya menggunakan Sofware SMS 8.0 model CG Wave.Dari hasil analisis data angin selama 10 tahun bahwa arah angin dominan berasal dari arah Tenggara dengan kecepatan rata-rata distribusi frekuensi sebesar 3,73 m/s dengan fetch efektif terpanjang sebesar 160,41 km. Hasil analisis mawar gelombang (Waverose) didapatkan bahwa bulan Agustus merupakan bulan dimana tinggi gelombang mencapai titik tertingginya dengan tinggi gelombang signifikan selama 10 tahun sebesar 3,757 m. Berdasarkan titik tinjauan utama pada simulasi CG Wave didapatkan hasil persentase besar terjadinya tinggi gelombang dari arah selatan, tenggara dan timur setelah adanya breakwater adalah sebesar antara 1,37% - 8,71% dan persentase tinggi gelombang tanpa breakwater sebesar antara 98,63% - 117,28%. Semakin besar persentase tinggi gelombangnya maka semakin besar tinggi gelombang yang terjadi sehingga dapat mempengaruhi keefektifan mulut Breakwater tersebut, sehingga model breakwater tersebut masih efektif dan aman untuk menghalau laju gelombang.Kata Kunci: Breakwater PLTU Cilacap, Metode Weibull, Metode Gumbel (Fisher-Tippet Type I), CG Wave
 ABSTRACT PLTU Cilacap是唯一一个在爪哇岛南部运行的发电厂,并与爪哇-巴厘岛系统相连。确切地说,位于卡兰坎德里村,凯苏吉汉区,奇拉恰普县,距离奇拉恰普市20公里。Cilacap发电厂有一个防波堤建筑,可以抑制来袭的海浪,并保护发电厂周围的区域免受破坏,其有效性取决于防波堤方向的放置。写这个Final Project的目的是分析PLTU Karangkandri Cilacap防波堤的波浪变换特征,并评估防波堤的性能。所使用的数据包括:测深数据、10年风数据和位置地图。在分析10年的风资料中,计算返回波的方法是Weibull和Gumbel (Fisher-Tippet Type I)组成的SMB方法,以及使用software SMS 8.0 CG波浪模型进行波浪模拟。从10年风资料分析结果看,主要风向为东南风,平均风速分布为3.73 m / s,最长有效航迹为160.41 km。浪高分析表明,8月是浪高达到最高点的月份,10年来显著浪高为3.757 m。基于CG波浪模拟的主要观点,结果表明,防波堤后的南、东南、东方向浪高占比较大,在1.37% ~ 8.71%之间,不设防波堤的浪高占比在98.63% ~ 117.28%之间。波高百分比越大,所发生的波高越大,从而影响防波堤口的有效性,使防波堤模型对驱动波速仍然有效和安全。关键词:PLTU Cilacap防波堤,Weibull法,Gumbel法(Fisher-Tippet Type I), CG WaveINTISARI PLTU Cilacap merupakan satu-satunya pembangkit yang beroperasi di pulau java bagian selatan and terinterkoneksi dengan system java -baliTepatnya terletak di desa Karangkandri, kecamatan Kesugihan, Kabupaten Cilacap, 20公里达里kota Cilacap。中华人民共和国人民解放军防波堤中华人民共和国人民解放军防波堤中华人民共和国防波堤中华人民共和国防波堤Tujuan dari penulisan Tugas Akhir ini adalah menganalisis karakteristik transformasi gelombang dan mengevaluaskinerja防波堤PLTU Karangkandri Cilacap。Data yang digunakan antara lain: Data Batimetri, Data Angin selama 10 tahun, dan Peta Lokasi。Metode yang digunakan dalam分析数据angin selama 10 tahun untuk menghitung gelombang kala ulang adalah Metode SMB yang terdiri dari Weibull dan Gumbel (Fisher-Tippet Type I),模拟gelombangnya menggunakan software SMS 8.0模型CG波浪。达哈西分析数据在selama 10 tahun bahwa arah angin dominan berasal arah Tenggara dengan keepatan rata-rata分布,frekuensi sebesar 3,73 m/s dengan获取效果,terpanjang sebesar 160,41 km。Hasil分析mawar gelombang (Waverose) didapatkan bahwa bulan Agustus merupakan bulan dimana tinggi gelombang menapai titik tertingginya dengan tinggi gelombang signifikan selama 10 tahun sebesar 3,757 m。Berdasarkan titik tinjauan utama pada simulasi CG Wave didapatkan hasil代表了abar terjadinya tinggi gelombang adanya防波堤adalah sebesar antara 1,37% - 8,71%代表了abara gelombang tanpa防波堤sebesar antara 98,63% - 117,28%。Semakin besar表示为tinggi gelombangnya maka Semakin besar tinggi gelombang yang terjadi sehinga dapat mempengaruhi keefektifan mulut防波堤,sehinga模型防波堤,但masih effktif dan untuk menghalau laju gelombang。Kata Kunci:防波堤PLTU Cilacap, Metode Weibull, Metode Gumbel (Fisher-Tippet Type I), CG波浪