Due date control in order-driven FAB with high priority orders

Y. Chung, S. C. Park, Byung H. Kim, J. Seo
{"title":"Due date control in order-driven FAB with high priority orders","authors":"Y. Chung, S. C. Park, Byung H. Kim, J. Seo","doi":"10.1109/WSC.2014.7020098","DOIUrl":null,"url":null,"abstract":"Presented in this paper is a dispatching rule to achieve the on-time delivery for an order-driven FAB involving high priority orders. We classify orders into two groups; regular orders (RO), high priority orders (HPO). HPO lots have shorter cycle times, tighter target due date and higher margins than RO lots. The proposed rule introduces the concept of reservation for HPO lots, which means the provisional allocation of capacity to meet the on-time delivery of HPO lots. Since the rule considers the due date of HPO lots first, RO lots might be tardy. To minimize the tardiness of RO lots, the proposed rule considers tool utilization as well as on-time delivery of HPO lots. We developed a simulation model based on MIMAC6, and conducted experimentations with MOZART®. The experimentation results show that the proposed dispatching rule can achieve the on-time delivery of HPO lots with the minimum tardiness of RO lots.","PeriodicalId":446873,"journal":{"name":"Proceedings of the Winter Simulation Conference 2014","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Winter Simulation Conference 2014","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2014.7020098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Presented in this paper is a dispatching rule to achieve the on-time delivery for an order-driven FAB involving high priority orders. We classify orders into two groups; regular orders (RO), high priority orders (HPO). HPO lots have shorter cycle times, tighter target due date and higher margins than RO lots. The proposed rule introduces the concept of reservation for HPO lots, which means the provisional allocation of capacity to meet the on-time delivery of HPO lots. Since the rule considers the due date of HPO lots first, RO lots might be tardy. To minimize the tardiness of RO lots, the proposed rule considers tool utilization as well as on-time delivery of HPO lots. We developed a simulation model based on MIMAC6, and conducted experimentations with MOZART®. The experimentation results show that the proposed dispatching rule can achieve the on-time delivery of HPO lots with the minimum tardiness of RO lots.
在订单驱动的FAB中控制高优先级订单的到期日期
针对高优先级订单驱动型FAB,提出了一种实现准时交货的调度规则。我们把订单分成两组;常规订单(RO),高优先级订单(HPO)。HPO批次比RO批次有更短的周期时间,更严格的目标截止日期和更高的利润。拟议的规则引入了HPO批次保留的概念,这意味着临时分配容量以满足HPO批次的按时交付。由于规则首先考虑HPO批的到期日,因此RO批可能会延迟。为了最大限度地减少RO批次的延误,建议的规则考虑了工具利用率以及HPO批次的准时交付。我们建立了一个基于MIMAC6的仿真模型,并使用MOZART®进行了实验。实验结果表明,所提出的调度规则能够实现HPO批次的准时交货,且RO批次的延误时间最小。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信