Case Study and Lessons Learnt for the 1St Fully Integrated Hwu Well Abandonment at Field a Offshore Malaysia

Shahril Yang Shahril Shahril, Tengku Khairul Izwan Tengku Ahmad Tengku Khairul Tengku Khairul, Khalieff Fathiee Lokman Zakey Khalieff Fathiee Khalieff
{"title":"Case Study and Lessons Learnt for the 1St Fully Integrated Hwu Well Abandonment at Field a Offshore Malaysia","authors":"Shahril Yang Shahril Shahril, Tengku Khairul Izwan Tengku Ahmad Tengku Khairul Tengku Khairul, Khalieff Fathiee Lokman Zakey Khalieff Fathiee Khalieff","doi":"10.2118/208496-ms","DOIUrl":null,"url":null,"abstract":"\n Uzma was awarded with 1st integrated well abandonment under Provision of Well Abandonment Integrated Services (WAISE) in 2018. Total of 22 wells were plug & abandonment with average 10 to 20 days per well were spent to complete the work. The scope of works is inclusive providing Project Management Team, Hydraulic Workover Unit, Accommodation Work Boat, Supply Vessels, and P&A services.\n This paper will highlight the practical experiences and capture the lessons learned obtained executing 1st integrated well abandonment campaign in Field A Offshore Malaysia. This paper presents the overall project lesson learnt for 1st integrated well abandonment embarked from early stage of project planning, preparation, acceptance, technical, operation & project close out. The lesson learnt will be beneficial for all Operator & Contractor Company involving with integrated well abandonment. This paper also presents capability of hydraulic workover unit and recommendation for future of low-cost well's plug and abandonment.\n Plug and abandonment operations with conventional hydraulic workover units have an enormous impact on low-cost plug and abandonment campaign in Malaysia compared with conventional drilling rigs. In essence, the lessons learned and insights gained throughout abandonment campaigns will keep accumulating with time to feed into the knowledge and experience vault. With proper project lesson learnt, many success cases and best practices can be emulated both from technical and commercial point of view. This lesson learnt will be beneficial for all Operator & Contractor Company involving with integrated well abandonment.","PeriodicalId":335246,"journal":{"name":"Day 1 Tue, November 30, 2021","volume":"16 3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, November 30, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208496-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Uzma was awarded with 1st integrated well abandonment under Provision of Well Abandonment Integrated Services (WAISE) in 2018. Total of 22 wells were plug & abandonment with average 10 to 20 days per well were spent to complete the work. The scope of works is inclusive providing Project Management Team, Hydraulic Workover Unit, Accommodation Work Boat, Supply Vessels, and P&A services. This paper will highlight the practical experiences and capture the lessons learned obtained executing 1st integrated well abandonment campaign in Field A Offshore Malaysia. This paper presents the overall project lesson learnt for 1st integrated well abandonment embarked from early stage of project planning, preparation, acceptance, technical, operation & project close out. The lesson learnt will be beneficial for all Operator & Contractor Company involving with integrated well abandonment. This paper also presents capability of hydraulic workover unit and recommendation for future of low-cost well's plug and abandonment. Plug and abandonment operations with conventional hydraulic workover units have an enormous impact on low-cost plug and abandonment campaign in Malaysia compared with conventional drilling rigs. In essence, the lessons learned and insights gained throughout abandonment campaigns will keep accumulating with time to feed into the knowledge and experience vault. With proper project lesson learnt, many success cases and best practices can be emulated both from technical and commercial point of view. This lesson learnt will be beneficial for all Operator & Contractor Company involving with integrated well abandonment.
马来西亚海上油田a第一口完全集成的Hwu井弃井案例分析与经验教训
2018年,Uzma获得了第一次综合弃井服务(WAISE)。总共有22口井进行了桥塞弃井,平均每口井耗时10至20天。工程范围包括提供项目管理团队、液压修井装置、住宿工作船、补给船和P&A服务。本文将重点介绍在马来西亚海上A油田执行第一次综合弃井作业的实践经验和经验教训。本文从项目前期的规划、准备、验收、技术、操作和项目收尾等方面介绍了第一口综合弃井的总体经验教训。从中吸取的经验教训将对所有参与综合弃井的运营商和承包商公司有益。文中还介绍了水力修井装置的性能,并对今后低成本井塞弃井的发展提出了建议。在马来西亚,与传统钻井平台相比,传统液压修井装置的桥塞和弃井作业对低成本的桥塞和弃井作业产生了巨大的影响。从本质上讲,在弃井过程中获得的经验教训和见解将随着时间的推移而不断积累,最终形成知识和经验库。有了适当的项目经验,从技术和商业的角度来看,许多成功的案例和最佳实践都可以被模仿。这一经验教训对所有参与综合弃井的运营商和承包商公司都是有益的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信