Coals transportation's steep route to realization

Muhammad Septiawan, Illy Yanti, Sigit Hartono
{"title":"Coals transportation's steep route to realization","authors":"Muhammad Septiawan, Illy Yanti, Sigit Hartono","doi":"10.30631/sdgs.v1i1.905","DOIUrl":null,"url":null,"abstract":"This research is motivated by the unrealized specific road for transporting coal mining products in Jambi Province which has been delayed for 9 years. This study uses a qualitative research approach. The data sources used in the study were selected by purposive sampling method. The results showed that the construction of a specific road for coal transportation in Jambi Province had not yet had an impact on people's lives. These impacts are economic, social and road safety impacts. The unrealized policy is caused by several factors including the budget, political pressure, the complexity of licensing, and the dynamics of land acquisition.","PeriodicalId":267467,"journal":{"name":"Sustainability (STPP) Theory, Practice and Policy","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainability (STPP) Theory, Practice and Policy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30631/sdgs.v1i1.905","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This research is motivated by the unrealized specific road for transporting coal mining products in Jambi Province which has been delayed for 9 years. This study uses a qualitative research approach. The data sources used in the study were selected by purposive sampling method. The results showed that the construction of a specific road for coal transportation in Jambi Province had not yet had an impact on people's lives. These impacts are economic, social and road safety impacts. The unrealized policy is caused by several factors including the budget, political pressure, the complexity of licensing, and the dynamics of land acquisition.
煤炭运输的陡峭路线实现
本研究的动机是占碑省尚未实现的煤炭产品运输专用道路,该道路已经推迟了9年。本研究采用定性研究方法。本研究采用目的抽样方法选择数据来源。结果表明,占碑省煤炭运输专用道路的建设尚未对人们的生活产生影响。这些影响包括经济、社会和道路安全影响。未能实现的政策是由几个因素造成的,包括预算、政治压力、许可的复杂性和土地征用的动态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信