A Patient Transport Pilot Quality Improvement Team

Nancy Sullivan MBA (Director), Kari U. Frentzel MEng (Manager)
{"title":"A Patient Transport Pilot Quality Improvement Team","authors":"Nancy Sullivan MBA (Director), Kari U. Frentzel MEng (Manager)","doi":"10.1016/S0097-5990(16)30535-8","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":76392,"journal":{"name":"QRB. Quality review bulletin","volume":"18 7","pages":"Pages 215-221"},"PeriodicalIF":0.0000,"publicationDate":"1992-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S0097-5990(16)30535-8","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"QRB. Quality review bulletin","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0097599016305358","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12
病人转运飞行员质量改进小组
住院病人在医院内的运输是病人护理过程的关键组成部分。马萨诸塞州总医院(波士顿)召集了一个质量改进(QI)小组来改进这一过程,并在那里试点QI方法。当一个成功的QI项目所需要的基本要素很少或者还不具备的时候,试点QI项目有高级管理层严格审查的负担。作为该项目的参与者,作者描述了这个试点QI过程的方法和结果,以及从中吸取的经验教训。结果证实,尽管困难重重,但在试点项目中取得成功是可能的,并获得了进入QI旅程下一步所需的支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信