{"title":"Measurement system and method of millimeter wave active pulse radar pattern","authors":"玉丰 马, W. Li","doi":"10.1117/12.2664914","DOIUrl":null,"url":null,"abstract":"This paper introduces a measurement system and method of millimeter-wave active pulse radar pattern, which is suitable for the pattern test of small-sized active pulse radar. The measurement system is installed in a small-sized wave-absorbing black box, including positioner, spectrum analyzer, power meter, network analyzer and oscilloscope. LabVIEW virtual instrument programming control technology is used to develop an active pulse radar antenna testing system. Through programming design, millimeter-wave instrument control, the construction and integration of the measurement system are completed, and the actual radar pattern measurement is verified.","PeriodicalId":258680,"journal":{"name":"Earth and Space From Infrared to Terahertz (ESIT 2022)","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Earth and Space From Infrared to Terahertz (ESIT 2022)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2664914","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper introduces a measurement system and method of millimeter-wave active pulse radar pattern, which is suitable for the pattern test of small-sized active pulse radar. The measurement system is installed in a small-sized wave-absorbing black box, including positioner, spectrum analyzer, power meter, network analyzer and oscilloscope. LabVIEW virtual instrument programming control technology is used to develop an active pulse radar antenna testing system. Through programming design, millimeter-wave instrument control, the construction and integration of the measurement system are completed, and the actual radar pattern measurement is verified.