Applying An Overlapped Design Schedule Based Dependency Structure Matrix to Minimize Project Makespan

C. Ou-Yang, Indy Cesara
{"title":"Applying An Overlapped Design Schedule Based Dependency Structure Matrix to Minimize Project Makespan","authors":"C. Ou-Yang, Indy Cesara","doi":"10.2991/ICOIESE-18.2019.33","DOIUrl":null,"url":null,"abstract":"Design process scheduling is conducted by optimizing human resources or workers allocation to several tasks in project with several real constraints to achieve the objective, minimizing the project makespan. In real business case, despite the tasks are already allocated to the optimal workers, rework still can happen because of the uncertainty. The rework can lead to unexpected extra time consumption. To anticipate this unexpected problem, tasks overlapping method is proposed in this research to reduce the project makespan after worker allocation. However the task overlapping method has a drawback, it requires more coordination and interaction between workers who conduct each of overlapping tasks. This research emphasize overlapped design schedule in a design process based on worker cluster from Dependency Structure Matrix (DSM). Worker DSM is used to encounter the task overlapping’s drawback. Workers who come from same cluster have more coordination and interaction to each other. It is expected workers who assigned on tasks overlapped are from same cluster. This research’s intention is to provide the workers allocation to obtain optimal project makespan result and create worker clustering from worker-DSM to identify the tasks that can be overlapped in design process. It is also expected to show the possible rework time from tasks overlapping’s reduction time. Keywords— human resources allocation; project makespan; dependency structure matrix; worker cluster; overlapped design process; rework time","PeriodicalId":172108,"journal":{"name":"Proceedings of the 2018 International Conference on Industrial Enterprise and System Engineering (IcoIESE 2018)","volume":"7 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2018 International Conference on Industrial Enterprise and System Engineering (IcoIESE 2018)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/ICOIESE-18.2019.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Design process scheduling is conducted by optimizing human resources or workers allocation to several tasks in project with several real constraints to achieve the objective, minimizing the project makespan. In real business case, despite the tasks are already allocated to the optimal workers, rework still can happen because of the uncertainty. The rework can lead to unexpected extra time consumption. To anticipate this unexpected problem, tasks overlapping method is proposed in this research to reduce the project makespan after worker allocation. However the task overlapping method has a drawback, it requires more coordination and interaction between workers who conduct each of overlapping tasks. This research emphasize overlapped design schedule in a design process based on worker cluster from Dependency Structure Matrix (DSM). Worker DSM is used to encounter the task overlapping’s drawback. Workers who come from same cluster have more coordination and interaction to each other. It is expected workers who assigned on tasks overlapped are from same cluster. This research’s intention is to provide the workers allocation to obtain optimal project makespan result and create worker clustering from worker-DSM to identify the tasks that can be overlapped in design process. It is also expected to show the possible rework time from tasks overlapping’s reduction time. Keywords— human resources allocation; project makespan; dependency structure matrix; worker cluster; overlapped design process; rework time
应用基于依赖结构矩阵的重叠设计进度最小化项目最大完工时间
设计过程调度是通过对项目中若干实际约束条件下的若干任务进行人力资源或工人的优化配置,以达到目标,使项目最大完工时间最小化。在实际业务案例中,尽管任务已经分配给了最优工人,但由于不确定性,返工仍然可能发生。返工可能导致意外的额外时间消耗。针对这一意想不到的问题,本研究提出了任务重叠的方法来减少工人分配后的项目完工时间。然而,任务重叠方法有一个缺点,它需要在执行每个重叠任务的工作人员之间进行更多的协调和交互。本文研究了基于依赖结构矩阵(DSM)的工人集群设计过程中的重叠设计进度。为了克服任务重叠的缺点,采用了Worker DSM。来自同一集群的员工之间有更多的协调和互动。被分配在重叠任务上的工作人员应该来自同一个集群。本研究的目的是提供工人分配,以获得最优的项目完工时间结果,并从工人- dsm中创建工人聚类,以确定设计过程中可以重叠的任务。它也被期望显示从任务重叠的减少时间可能的返工时间。关键词:人力资源配置;项目时间;依存结构矩阵;工人集群;重叠设计过程;返工时间
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信