{"title":"Cell sites installation on medium voltage energized power lines","authors":"Mario Angel Ramos","doi":"10.1109/ICOLIM.2014.6934335","DOIUrl":null,"url":null,"abstract":"This paper describes the experience of installation of cell phone antennas (Cell Sites) on towers of medium and high voltage lines at Edenor, the main Distribution Utility of Buenos Aires, Argentina. There are the several advantages for society and telecom companies: less area occupied, lower costs by using existent support structures, easy permissions management, and reduction of visual impact. A working procedure covering all technical and operational aspects was developed and established a feasible, safe, efficient and standardized work plan in order to place antennas on the medium voltage network. This paper shows the entire process and the Work Method used.","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934335","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper describes the experience of installation of cell phone antennas (Cell Sites) on towers of medium and high voltage lines at Edenor, the main Distribution Utility of Buenos Aires, Argentina. There are the several advantages for society and telecom companies: less area occupied, lower costs by using existent support structures, easy permissions management, and reduction of visual impact. A working procedure covering all technical and operational aspects was developed and established a feasible, safe, efficient and standardized work plan in order to place antennas on the medium voltage network. This paper shows the entire process and the Work Method used.
在中压输电线上安装小区
本文介绍了在阿根廷布宜诺斯艾利斯主要配电公司Edenor中高压线路塔上安装手机天线(cell Sites)的经验。对于社会和电信公司来说,有几个优点:占用的面积更小,使用现有支持结构的成本更低,易于权限管理,减少视觉影响。制定了涵盖所有技术和业务方面的工作程序,并制定了可行、安全、高效和标准化的工作计划,以便在中压网络上放置天线。本文介绍了整个过程和所采用的工作方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信