{"title":"Design and Application of Wiring-free Transformation of Secondary Equipment in Switchgear Based on Plug and Play Technology","authors":"Yi Shi, Hongyan Shen, Yanli Feng, Lu Cui","doi":"10.1109/CIEEC.2018.8745758","DOIUrl":null,"url":null,"abstract":"The secondary equipment in the switchgear has complex transformation period, difficult construction and long time consuming. How to improve the efficiency is a problem in the engineering transformation. To solve this problem, this paper adopts the \"plug and play\" design concept to realize the modular assembly of new equipment through the equipment framework, and to set the green terminal flange of original equipment at the rear of the module and complete the cable wiring to new equipment to achieve the prefabricated wiring of the cable during the on-site transformation. A quick transformation scheme for the wiring-free equipment is proposed. The scheme may significantly shorten the transformation time and improve the operation and maintenance efficiency, and the application effect of the scheme is verified combined with the engineering application of the 110kV substation.","PeriodicalId":329285,"journal":{"name":"2018 IEEE 2nd International Electrical and Energy Conference (CIEEC)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 2nd International Electrical and Energy Conference (CIEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIEEC.2018.8745758","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The secondary equipment in the switchgear has complex transformation period, difficult construction and long time consuming. How to improve the efficiency is a problem in the engineering transformation. To solve this problem, this paper adopts the "plug and play" design concept to realize the modular assembly of new equipment through the equipment framework, and to set the green terminal flange of original equipment at the rear of the module and complete the cable wiring to new equipment to achieve the prefabricated wiring of the cable during the on-site transformation. A quick transformation scheme for the wiring-free equipment is proposed. The scheme may significantly shorten the transformation time and improve the operation and maintenance efficiency, and the application effect of the scheme is verified combined with the engineering application of the 110kV substation.
基于即插即用技术的开关柜二次设备免接线改造设计与应用
开关柜二次设备改造周期复杂,施工难度大,耗时长。如何提高效率是工程改造中的一个难题。针对这一问题,本文采用“即插即用”的设计理念,通过设备框架实现新设备的模块化组装,并在模块后方设置原设备的绿色端子法兰,完成对新设备的电缆布线,实现现场改造时电缆的预制布线。提出了一种无线设备的快速改造方案。该方案可显著缩短改造时间,提高运维效率,并结合110kV变电站的工程应用验证了该方案的应用效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信