Geology Driven History Matching

I. Matveev, G. Shishaev, G. Eremyan, V. Demyanov, O. Popova, S. Kaygorodov, B. Belozerov, I. Uzhegova, D. Konoshonkin, M. Korovin
{"title":"Geology Driven History Matching","authors":"I. Matveev, G. Shishaev, G. Eremyan, V. Demyanov, O. Popova, S. Kaygorodov, B. Belozerov, I. Uzhegova, D. Konoshonkin, M. Korovin","doi":"10.2118/196881-ms","DOIUrl":null,"url":null,"abstract":"\n This paper proposes the method of an automatic history matching (HM) with the ability to preserve geological realism and an example of its application in one of the fields in Western Siberia. The method assumes takes into account all identified uncertainties at the early stages of geological model construction and their synchronized variation within realistic limits during HM.\n There are interrelations between petrophysical and geological uncertainties, which significantly affect on the reservoir dynamics. Hence, changes in one of the parameters during HM should influence the synchronous change of the others in order to preserve the geological consistency of the simulation model within the given geological concept. As a result, engineer gets a set of history matched models providing a range of predictions, which can be used for investment decisions.","PeriodicalId":143392,"journal":{"name":"Day 1 Tue, October 22, 2019","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 22, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/196881-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper proposes the method of an automatic history matching (HM) with the ability to preserve geological realism and an example of its application in one of the fields in Western Siberia. The method assumes takes into account all identified uncertainties at the early stages of geological model construction and their synchronized variation within realistic limits during HM. There are interrelations between petrophysical and geological uncertainties, which significantly affect on the reservoir dynamics. Hence, changes in one of the parameters during HM should influence the synchronous change of the others in order to preserve the geological consistency of the simulation model within the given geological concept. As a result, engineer gets a set of history matched models providing a range of predictions, which can be used for investment decisions.
地质驱动历史匹配
本文提出了一种能够保持地质真实性的自动历史拟合方法,并给出了该方法在西西伯利亚某油田的应用实例。该方法假定考虑了地质模型构建初期所有确定的不确定性及其在HM过程中在现实限制范围内的同步变化。岩石物理不确定性与地质不确定性之间存在相互关系,对储层动力学有重要影响。因此,在HM过程中,其中一个参数的变化会影响其他参数的同步变化,以保持给定地质概念内模拟模型的地质一致性。结果,工程师得到一组历史匹配模型,提供一系列预测,可用于投资决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信