Will reengineering replace TQM?

M. Fallah, J. Weinman
{"title":"Will reengineering replace TQM?","authors":"M. Fallah, J. Weinman","doi":"10.1109/IEMC.1995.524582","DOIUrl":null,"url":null,"abstract":"If total quality management (TQM) was the key management concept of the decade of the 1980s, then surely reengineering has become the concept for the 1990s. Popular views on reengineering include: reengineering has supplanted TQM, reengineering alternates with TQM allowing for continuous improvement between periods of radical change, and reengineering has peaked and is on its way out. In this article, the authors examine these concepts and views, explores the relation of reengineering to TQM, and demonstrates that these views are incorrect or, at best, incomplete.","PeriodicalId":231067,"journal":{"name":"Proceedings for Operating Research and the Management Sciences","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings for Operating Research and the Management Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMC.1995.524582","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

If total quality management (TQM) was the key management concept of the decade of the 1980s, then surely reengineering has become the concept for the 1990s. Popular views on reengineering include: reengineering has supplanted TQM, reengineering alternates with TQM allowing for continuous improvement between periods of radical change, and reengineering has peaked and is on its way out. In this article, the authors examine these concepts and views, explores the relation of reengineering to TQM, and demonstrates that these views are incorrect or, at best, incomplete.
再造会取代TQM吗?
如果说全面质量管理(TQM)是20世纪80年代的关键管理概念,那么再造无疑已成为20世纪90年代的概念。关于再工程的流行观点包括:再工程已经取代了TQM,再工程与TQM交替,允许在剧烈变化的时期之间进行持续改进,再工程已经达到顶峰,并且正在退出。在本文中,作者检查了这些概念和观点,探讨了再造与TQM的关系,并证明了这些观点是不正确的,或者充其量是不完整的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信