{"title":"Transients at GSU transformer terminals. I. Historical case analysis","authors":"Xuzhu Dong, S. Rosado, Yilu Liu, Nien-Chung Wang, T. Guo","doi":"10.1109/PESW.2001.917054","DOIUrl":null,"url":null,"abstract":"In a large pumped storage plant, three generator step-up (GSU) transformers successively failed in recent years and considerable economic loss is resulted for the utility. Therefore, a comprehensive investigation is done to find out the possible failure causes. Several aspects are considered in this study, including overall review of historical GSU transformer failures, modeling and simulation of switching transients resulting from various possible routine switching operations and lightning overvoltages that may affect the GSU transformer insulation, and modeling and simulation of harmonics and transients due to static frequency converter (SFC) operation that may be seen by the transformers. This paper extensively reviewed the historical GSU transformer failures, and discussed possible effects of switching transients, lightning, very fast transients (VFT), harmonics, on the transformers, some suggestions are given for the troubleshooting of the GSU transformer failures in the pumped storage plant. The detailed modeling and simulation are presented later in another paper.","PeriodicalId":253534,"journal":{"name":"2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194)","volume":"464 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESW.2001.917054","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In a large pumped storage plant, three generator step-up (GSU) transformers successively failed in recent years and considerable economic loss is resulted for the utility. Therefore, a comprehensive investigation is done to find out the possible failure causes. Several aspects are considered in this study, including overall review of historical GSU transformer failures, modeling and simulation of switching transients resulting from various possible routine switching operations and lightning overvoltages that may affect the GSU transformer insulation, and modeling and simulation of harmonics and transients due to static frequency converter (SFC) operation that may be seen by the transformers. This paper extensively reviewed the historical GSU transformer failures, and discussed possible effects of switching transients, lightning, very fast transients (VFT), harmonics, on the transformers, some suggestions are given for the troubleshooting of the GSU transformer failures in the pumped storage plant. The detailed modeling and simulation are presented later in another paper.
GSU变压器端子的瞬变。一、历史案例分析
近年来,某大型抽水蓄能电站连续发生3台发电机升压变压器故障,给电厂造成了相当大的经济损失。因此,要进行全面的调查,找出可能的故障原因。本研究考虑了几个方面,包括对GSU变压器历史故障的全面回顾,由各种可能的常规开关操作和可能影响GSU变压器绝缘的雷电过电压引起的开关瞬态的建模和仿真,以及由静态变频器(SFC)操作引起的谐波和瞬态的建模和仿真。本文广泛地回顾了历史上GSU变压器的故障,讨论了开关暂态、雷电、快速暂态、谐波等对变压器的可能影响,并对抽水蓄能电站GSU变压器故障的排除提出了一些建议。详细的建模和仿真在后面的另一篇文章中进行了介绍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信