{"title":"Grounding systems efficiency in areas with reduced accessibility","authors":"G. Parise, L. Parise, L. Martirano, A. Farber, Boris Katz","doi":"10.1109/IAS.2014.6978477","DOIUrl":null,"url":null,"abstract":"Efficiency of grounding systems has to be verified periodically in the operational time. With urban development and buildings growth adjacent to power systems as HV/MV substations, it is very rare to have area around with sufficient accessibility for installing the potential and current electrodes. This paper discusses a safety criterion to verify the efficiency of a grounding system. By means of this criterion, conservative tests are suggested for both ground potential rise and touch voltage and step voltage that allow to verify the grounding systems efficiency in areas with reduced accessibility and also to monitor its evolution in the time.","PeriodicalId":446068,"journal":{"name":"2014 IEEE Industry Application Society Annual Meeting","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Industry Application Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2014.6978477","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Efficiency of grounding systems has to be verified periodically in the operational time. With urban development and buildings growth adjacent to power systems as HV/MV substations, it is very rare to have area around with sufficient accessibility for installing the potential and current electrodes. This paper discusses a safety criterion to verify the efficiency of a grounding system. By means of this criterion, conservative tests are suggested for both ground potential rise and touch voltage and step voltage that allow to verify the grounding systems efficiency in areas with reduced accessibility and also to monitor its evolution in the time.
可达性较低地区的接地系统效率
在运行期间,接地系统的有效性需要定期验证。随着城市的发展和建筑在高压/中压变电站附近的电力系统附近的增长,很少有足够的区域可以安装电位和电流电极。本文讨论了验证接地系统效率的安全准则。根据这一准则,建议对接地电位上升、接触电压和步进电压进行保守试验,以验证可达性较差地区接地系统的效率,并监测其随时间的演变。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信