A Pilot Study of Identifying Execution Plan Differences for Accelerated Bridge Construction

Elina Prajapati, Jin Ouk Choi
{"title":"A Pilot Study of Identifying Execution Plan Differences for Accelerated Bridge Construction","authors":"Elina Prajapati, Jin Ouk Choi","doi":"10.29173/MOCS94","DOIUrl":null,"url":null,"abstract":"Accelerated bridge construction (ABC) is an innovative construction technique used to accelerate the construction of new bridges, as well as the renovation/replacement of existing bridges. Due to the benefits offered by ABC, transportation authorities have a higher preference in executing an accelerated approach over conventional bridge construction. The execution of an accelerated approach has differences when compared to the conventional approach, and it is important to identify such differences for the successful implementation of ABC projects. However, there have been no studies to identify such execution differences. Therefore, this study was conducted to identify execution plan differences relevant to ABC. For this purpose, an extensive literature review was conducted to prepare a preliminary list of execution plan differences. Then, a questionnaire survey was administered with the industry experts, who were previously involved in the execution of ABC projects, to validate the preliminary list. Based on the literature review and the responses from questionnaire survey, this study identified 61 execution plan differences relevant to ABC in different phases of execution. This study is expected to benefit owners, contractors, and road/bridge users for successful execution of ABC projects.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"2005 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modular and Offsite Construction (MOC) Summit Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29173/MOCS94","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Accelerated bridge construction (ABC) is an innovative construction technique used to accelerate the construction of new bridges, as well as the renovation/replacement of existing bridges. Due to the benefits offered by ABC, transportation authorities have a higher preference in executing an accelerated approach over conventional bridge construction. The execution of an accelerated approach has differences when compared to the conventional approach, and it is important to identify such differences for the successful implementation of ABC projects. However, there have been no studies to identify such execution differences. Therefore, this study was conducted to identify execution plan differences relevant to ABC. For this purpose, an extensive literature review was conducted to prepare a preliminary list of execution plan differences. Then, a questionnaire survey was administered with the industry experts, who were previously involved in the execution of ABC projects, to validate the preliminary list. Based on the literature review and the responses from questionnaire survey, this study identified 61 execution plan differences relevant to ABC in different phases of execution. This study is expected to benefit owners, contractors, and road/bridge users for successful execution of ABC projects.
加速桥梁施工执行计划差异识别的试点研究
加速桥梁施工(ABC)是一种创新的施工技术,用于加速新桥的建造,以及现有桥梁的翻新/更换。由于ABC提供的好处,运输当局更倾向于执行加速方法,而不是传统的桥梁施工。与传统方法相比,加速方法的执行存在差异,识别这些差异对于ABC项目的成功实施非常重要。然而,还没有研究确定这种执行差异。因此,本研究旨在识别与作业成本法相关的执行计划差异。为此,我们进行了广泛的文献综述,以编制执行计划差异的初步清单。然后,与以前参与ABC项目执行的行业专家进行问卷调查,以验证初步清单。通过文献回顾和问卷调查,本研究确定了61项与作业成本法相关的执行计划在不同执行阶段的差异。这项研究预计将有利于业主、承包商和道路/桥梁使用者成功执行ABC项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信