{"title":"Dynamic programming solution to the stochastic multiple lot dispatching in an FMS","authors":"F. Chauny, A. Haurie, P. L. Ecuyer, R. Loulou","doi":"10.1109/CIM.1988.5414","DOIUrl":null,"url":null,"abstract":"The production scheduling problem considered is related to the planning of operations of a flexible manufacturing cell composed of a punch press and a shear that produce parts from metal plates. A stochastic control problem is identified, to optimize the expected discounted cost of the system. The control consists in dispatching n bins to a processor unit which can process only one bin at a time. A dynamic programming approach is used, and numerical techniques are applied for the solution of the two-bin case. Numerical results are presented and discussed.<<ETX>>","PeriodicalId":334994,"journal":{"name":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","volume":"457 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIM.1988.5414","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
The production scheduling problem considered is related to the planning of operations of a flexible manufacturing cell composed of a punch press and a shear that produce parts from metal plates. A stochastic control problem is identified, to optimize the expected discounted cost of the system. The control consists in dispatching n bins to a processor unit which can process only one bin at a time. A dynamic programming approach is used, and numerical techniques are applied for the solution of the two-bin case. Numerical results are presented and discussed.<>