{"title":"Practice of Integrated Management and Platform Construction for Group-level Engineering Project Based on GIS+BIM Technology","authors":"Xuejian Wang, Jiayuan Wang, Yuyu Zhang, Li-Jie Zhang, Xiaolin Zhou","doi":"10.4108/eai.24-2-2023.2330659","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":388726,"journal":{"name":"Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2nd International Conference on Engineering Management and Information Science, EMIS 2023, February 24-26, 2023, Chengdu, China","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4108/eai.24-2-2023.2330659","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}