Intermittent demand forecasting for long tail SKUs

Arnab Ghosh Dastidar
{"title":"Intermittent demand forecasting for long tail SKUs","authors":"Arnab Ghosh Dastidar","doi":"10.1109/ICDMAI.2017.8073537","DOIUrl":null,"url":null,"abstract":"This paper provides systems and methods for the demand planner to improve forecasting intermittent long-tail demand by leveraging cluster-based processing. The proposed framework has been established on the demand data for a global power-generation business with reliable forecast number accuracy. The exploratory analysis encompasses both demand profiling and product classification stages, and the forecasting system identifies a cluster from historical demand data. Clustering aims to partition n products into k clusters, in which each product belongs to the cluster with the nearest product attribute. Demand of products within each cluster are aggregated, and the Unobserved Components time series Model (UCM) has been used to forecast at cluster level. Cluster-level forecasts are then disaggregated into child products based on the ratio of recent consumption.","PeriodicalId":368507,"journal":{"name":"2017 International Conference on Data Management, Analytics and Innovation (ICDMAI)","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Data Management, Analytics and Innovation (ICDMAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDMAI.2017.8073537","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper provides systems and methods for the demand planner to improve forecasting intermittent long-tail demand by leveraging cluster-based processing. The proposed framework has been established on the demand data for a global power-generation business with reliable forecast number accuracy. The exploratory analysis encompasses both demand profiling and product classification stages, and the forecasting system identifies a cluster from historical demand data. Clustering aims to partition n products into k clusters, in which each product belongs to the cluster with the nearest product attribute. Demand of products within each cluster are aggregated, and the Unobserved Components time series Model (UCM) has been used to forecast at cluster level. Cluster-level forecasts are then disaggregated into child products based on the ratio of recent consumption.
长尾库存单位的间歇性需求预测
本文为需求规划者利用基于集群的处理改进间歇性长尾需求的预测提供了系统和方法。该框架以全球发电企业的需求数据为基础,具有可靠的预测数字精度。探索性分析包括需求分析和产品分类两个阶段,预测系统从历史需求数据中确定一个集群。聚类的目的是将n个产品划分为k个聚类,每个产品都属于产品属性最接近的聚类。对各集群内的产品需求进行了汇总,并利用未观察组件时间序列模型(unobservable Components time series Model, UCM)在集群层面进行了预测。然后根据最近消费的比例将集群级预测分解为儿童产品。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信