{"title":"Identifying Issues that Adversely Affect Data Center Reliability through Electrical System Audits","authors":"T. Dionise, C. Cooper","doi":"10.1109/IAS.2010.5615720","DOIUrl":null,"url":null,"abstract":"In today's business world, a continuous uninterrupted process equates to more profit especially in a Data Center. Some electrical power failures at Data Centers are catastrophic, causing hours of downtime and thousands in lost profit. More and more, facility managers are realizing the importance of being proactive about identifying reliability weaknesses in the electrical distribution system through electrical system audits. An electrical system audit is the first step in assuring that a Data Center power system is operating reliably, safely and efficiently, maximizing use of capital and minimizing operating expenses. Based on experience gained in performing electrical system audits of Data Centers, the authors will share significant electrical issues that adversely affect Data Center Reliability. This paper will identify key findings, symptoms and issues and provide solutions as well industry best practices.","PeriodicalId":317643,"journal":{"name":"2010 IEEE Industry Applications Society Annual Meeting","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Industry Applications Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2010.5615720","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

In today's business world, a continuous uninterrupted process equates to more profit especially in a Data Center. Some electrical power failures at Data Centers are catastrophic, causing hours of downtime and thousands in lost profit. More and more, facility managers are realizing the importance of being proactive about identifying reliability weaknesses in the electrical distribution system through electrical system audits. An electrical system audit is the first step in assuring that a Data Center power system is operating reliably, safely and efficiently, maximizing use of capital and minimizing operating expenses. Based on experience gained in performing electrical system audits of Data Centers, the authors will share significant electrical issues that adversely affect Data Center Reliability. This paper will identify key findings, symptoms and issues and provide solutions as well industry best practices.
通过电气系统审计识别对数据中心可靠性有不利影响的问题
在当今的商业世界中,持续不间断的流程等同于更多的利润,尤其是在数据中心中。数据中心的一些电力故障是灾难性的,造成数小时的停机时间和数千美元的利润损失。越来越多的设施管理人员意识到通过电气系统审计主动识别配电系统可靠性弱点的重要性。电气系统审计是确保数据中心电力系统可靠、安全、高效运行,最大限度地利用资金,最大限度地减少运营费用的第一步。根据在执行数据中心电气系统审计中获得的经验,作者将分享对数据中心可靠性产生不利影响的重要电气问题。本文将确定主要发现、症状和问题,并提供解决方案以及行业最佳实践。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信