Implementasi EOQ (Economic Orger Quantity) Untuk Perencanaan Dan Persediaan Pipa HDPE di PDAM Tirta Mayang Kota Jambi

Agus Subekti
{"title":"Implementasi EOQ (Economic Orger Quantity) Untuk Perencanaan Dan Persediaan Pipa HDPE di PDAM Tirta Mayang Kota Jambi","authors":"Agus Subekti","doi":"10.37338/JI.V3I`1.158","DOIUrl":null,"url":null,"abstract":"The problem in this research is how to forecast HDPE pipe supply orders at PDAM Tirta Mayang Jambi using the Economic Order Quantity (EOQ) method ?. The purpose of this study was to determine the Forecasting of HDPE Pipe Supply Orders at PDAM Tirta Mayang Jambi using the Economic Order Quantity (EOQ) method. The research method used in this research is descriptive method. According to Nazir (2011), \"The descriptive research method is a method of examining the status of a group of people, an object, a condition, a system of thinking, or a class of events in the present\". The research objective is used to describe or explain accurately, systematically the facts in the phenomenon under study. Through this descriptive research, the researcher aims to obtain and describe how to apply the Economic Order Quantity (EOQ) inventory method in addition to the inventory method applied by PDAM Tirta Mayang Jambi City. \nFrom the analysis carried out on the HDPE pipe supply control at PDAM Tirta Mayang, Jambi City, it can be seen: (1) To forecast the need for HDPE pipe for new connections using the linear regression method. So that the total estimated number of HDPE pipes needed during 2020 is 23766 meters of pipe for one year needs. (2) The EOQ method is used to determine the number of economic orders that a company must place at 3256 meters / Order. (3) For the total cost that must be incurred by the company using EOQ is Rp. 45,448,450, while using the conventional method the company has to pay a higher cost of Rp. 88,768,650. so that it can be seen that there is a very large difference between using the EOQ method and the conventional amounting to Rp. 43,320,200, -.","PeriodicalId":431004,"journal":{"name":"Jurnal Inovator","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Inovator","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37338/JI.V3I`1.158","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The problem in this research is how to forecast HDPE pipe supply orders at PDAM Tirta Mayang Jambi using the Economic Order Quantity (EOQ) method ?. The purpose of this study was to determine the Forecasting of HDPE Pipe Supply Orders at PDAM Tirta Mayang Jambi using the Economic Order Quantity (EOQ) method. The research method used in this research is descriptive method. According to Nazir (2011), "The descriptive research method is a method of examining the status of a group of people, an object, a condition, a system of thinking, or a class of events in the present". The research objective is used to describe or explain accurately, systematically the facts in the phenomenon under study. Through this descriptive research, the researcher aims to obtain and describe how to apply the Economic Order Quantity (EOQ) inventory method in addition to the inventory method applied by PDAM Tirta Mayang Jambi City. From the analysis carried out on the HDPE pipe supply control at PDAM Tirta Mayang, Jambi City, it can be seen: (1) To forecast the need for HDPE pipe for new connections using the linear regression method. So that the total estimated number of HDPE pipes needed during 2020 is 23766 meters of pipe for one year needs. (2) The EOQ method is used to determine the number of economic orders that a company must place at 3256 meters / Order. (3) For the total cost that must be incurred by the company using EOQ is Rp. 45,448,450, while using the conventional method the company has to pay a higher cost of Rp. 88,768,650. so that it can be seen that there is a very large difference between using the EOQ method and the conventional amounting to Rp. 43,320,200, -.
本文研究的问题是如何使用经济订货量(EOQ)方法预测PDAM Tirta Mayang Jambi的HDPE管道供应订单。本研究的目的是利用经济订货量(EOQ)方法确定PDAM Tirta Mayang Jambi HDPE管道供应订单的预测。本研究采用的研究方法是描述性方法。根据Nazir(2011)的说法,“描述性研究方法是一种检查当前一群人,一个对象,一种条件,一种思维系统或一类事件的状态的方法”。研究目标是用来准确、系统地描述或解释所研究现象中的事实。通过这个描述性的研究,研究者的目的是获得和描述在PDAM Tirta Mayang Jambi市使用的库存方法之外,如何应用经济订货量(EOQ)库存方法。通过对占碑市Tirta Mayang PDAM HDPE管材供应控制的分析,可以看出:(1)利用线性回归方法预测新建连接HDPE管材的需求。因此,预计2020年全年所需的HDPE管材总量为23766米。(2) EOQ法用于确定公司在3256米/订单处必须下的经济订单数量。(3)使用EOQ法公司必须支付的总成本为Rp. 45,448,450,而使用常规方法公司必须支付更高的成本Rp. 88,768,650。因此,可以看出,使用EOQ方法与常规方法之间存在非常大的差异,共计Rp. 43,320,200, -。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信