{"title":"Optimal Scheduling for State Estimation Using a Terminal Cost Function","authors":"C.O. Savage, B. L. Scala, W. Moran","doi":"10.1109/ICIF.2006.301677","DOIUrl":null,"url":null,"abstract":"In this paper we consider state estimation problems where there are multiple independent processes evolving but the estimation scheme can only select a limited set of processes to measure at each time step. Within a Gauss-Markov framework, we show the optimality of a scheduling scheme under various scenarios. These types of problems are common in sensor scheduling applications","PeriodicalId":248061,"journal":{"name":"2006 9th International Conference on Information Fusion","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 9th International Conference on Information Fusion","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIF.2006.301677","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
In this paper we consider state estimation problems where there are multiple independent processes evolving but the estimation scheme can only select a limited set of processes to measure at each time step. Within a Gauss-Markov framework, we show the optimality of a scheduling scheme under various scenarios. These types of problems are common in sensor scheduling applications