{"title":"Application of bootstrap technique in power system risk assessment","authors":"S. R. Kasim, Muhammad Murtadha Othman, N. A. Ghani, I. Musirin","doi":"10.1109/PEOCO.2010.5559246","DOIUrl":null,"url":null,"abstract":"This paper presents the risk assessment of power system that takes into account the system failure indices and uncertainty of unavailable load variations estimated by using the bootstrap technique. The risk of the system is measured by using the expected energy not supplied (EENS) index as well as the probability of load curtailment (PLC). The bootstrap technique is a tool which provides simplest way to perform risk assessment of a power system. Furthermore, it also requires very little assumptions to carry-out the risk analysis and it is imperative for a small size of available information. The application of bootstrap technique is important to assess the risk indices at every level of system uncertainty. The IEEE 24-bus Reliability Test System (RTS) is used as a case study in the analysis of system risk severity based EENS and PLC. Comparative studies have been made on the risk assessment of the power system determined by using the bootstrap technique and fuzzy set.","PeriodicalId":379868,"journal":{"name":"2010 4th International Power Engineering and Optimization Conference (PEOCO)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 4th International Power Engineering and Optimization Conference (PEOCO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PEOCO.2010.5559246","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper presents the risk assessment of power system that takes into account the system failure indices and uncertainty of unavailable load variations estimated by using the bootstrap technique. The risk of the system is measured by using the expected energy not supplied (EENS) index as well as the probability of load curtailment (PLC). The bootstrap technique is a tool which provides simplest way to perform risk assessment of a power system. Furthermore, it also requires very little assumptions to carry-out the risk analysis and it is imperative for a small size of available information. The application of bootstrap technique is important to assess the risk indices at every level of system uncertainty. The IEEE 24-bus Reliability Test System (RTS) is used as a case study in the analysis of system risk severity based EENS and PLC. Comparative studies have been made on the risk assessment of the power system determined by using the bootstrap technique and fuzzy set.
自举技术在电力系统风险评估中的应用
本文提出了考虑系统故障指标和用自举法估计的不可用负荷变化不确定性的电力系统风险评估方法。利用预期无供能指数(EENS)和减载概率(PLC)来衡量系统的风险。自举技术是对电力系统进行风险评估的一种最简单的方法。此外,它还需要很少的假设来进行风险分析,并且必须有少量的可用信息。应用自举技术对系统不确定性各层次的风险指标进行评估具有重要意义。以IEEE 24总线可靠性测试系统(RTS)为例,分析了基于EENS和PLC的系统风险严重程度。对自举法和模糊集法确定的电力系统风险评估进行了比较研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信