Computer Based Algorithm for Optimizing Design and Construction of Large Industrial Power System Industrial Objectives

M. Frigura-Iliasa, Mirela Iorga, L. Dolga, H. Filipescu
{"title":"Computer Based Algorithm for Optimizing Design and Construction of Large Industrial Power System Industrial Objectives","authors":"M. Frigura-Iliasa, Mirela Iorga, L. Dolga, H. Filipescu","doi":"10.1109/SAMI.2019.8782732","DOIUrl":null,"url":null,"abstract":"This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.","PeriodicalId":240256,"journal":{"name":"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SAMI.2019.8782732","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.
大型工业电力系统工业目标优化设计与构建的计算机算法
本文提出了一个简单的算法,由一个适当的软件转发,以获得工程图的优化,为一个实际的400千伏架空电力线,位于罗马尼亚西部地区。采用Ford算法确定了整个施工序列的关键路径。通过强调所有阶段/操作之间的时间关系,我们获得了施工现场所有主要阶段的更准确的操作概况。新应用的软件可用于所有领域的其他工程应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信