{"title":"Specifics of Maturing and Geonavigation in Hotizontal Sections More than 1 Km Length and Multi-Lateral Wells","authors":"A. Antonov, D. Zhukov","doi":"10.3997/2214-4609.201901844","DOIUrl":null,"url":null,"abstract":"Summary Early stages of Piltun development were associated with multireservoir completion. These wells are producting from reservoirs with different properties. After several years different reservoirs had been depleted differently which increased complexity of surveillance. This circumstances pushed subsurface engineers of Sakhalin Energy Investment Company Ltd. to focus on maximizing production from dedicated areas within certain reservoirs. The best solution was found within horizontal wells. Here we’d like to share our experience of constructing and planning horizontal wells. How these wells would be navigated within the reservoir? What risks and gain are associated with them taking into account offshore factors of the field development?","PeriodicalId":423538,"journal":{"name":"Horizontal Wells 2019 Challenges and Opportunities","volume":"172 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Horizontal Wells 2019 Challenges and Opportunities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201901844","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Summary Early stages of Piltun development were associated with multireservoir completion. These wells are producting from reservoirs with different properties. After several years different reservoirs had been depleted differently which increased complexity of surveillance. This circumstances pushed subsurface engineers of Sakhalin Energy Investment Company Ltd. to focus on maximizing production from dedicated areas within certain reservoirs. The best solution was found within horizontal wells. Here we’d like to share our experience of constructing and planning horizontal wells. How these wells would be navigated within the reservoir? What risks and gain are associated with them taking into account offshore factors of the field development?
Piltun开发的早期阶段与多层完井有关。这些井的储层具有不同的性质。几年后,不同水库的枯竭情况不同,这增加了监测的复杂性。这种情况促使Sakhalin Energy Investment Company Ltd.的地下工程师专注于在特定油藏的特定区域实现产量最大化。在水平井中找到了最佳解决方案。在此,我们愿与大家分享水平井的施工和规划经验。这些井将如何在储层内导航?考虑到油田开发的海上因素,与之相关的风险和收益是什么?