Optimasi Void (Lubang Akhir Tambang) Pada Kegiatan Rencana Pascatambang Batubara di PT. Megaprima Persada Propinsi Kalimantan Timur

Akhmad Rifandy
{"title":"Optimasi Void (Lubang Akhir Tambang) Pada Kegiatan Rencana Pascatambang Batubara di PT. Megaprima Persada Propinsi Kalimantan Timur","authors":"Akhmad Rifandy","doi":"10.33084/mitl.v8i1.4650","DOIUrl":null,"url":null,"abstract":"This study aims to optimize the void function by engineering material handling so that in the post-mining stage it is expected that Void in the Northern area of 40 Ha with drainage RL 20 and Void in the Southern area of 140 Ha with drainage RL 11 to be used as a source of irrigation for rice fields and become the location of the planned infrastructure development of Solar Power Plants. Descriptive and quantitative data analysis is assisted using Geovia Minex, X Pac, Autocad Land Desktop, and Microsoft Excel software. Void optimization efforts yield; in the North void, the amount of material to be moved is 1,048,905 LCM, and the South void requires 2,346,460 LCM so the total volume of OB needed is 3,395,365 LCM. The work time is 15 months (1 year 3 months) using the main tool 3 units of PC 400 for excavation and 9 units of HINO FM260 for transportation with a total required cost of US$ 7,630,777","PeriodicalId":289030,"journal":{"name":"Media Ilmiah Teknik Lingkungan","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Ilmiah Teknik Lingkungan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33084/mitl.v8i1.4650","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to optimize the void function by engineering material handling so that in the post-mining stage it is expected that Void in the Northern area of 40 Ha with drainage RL 20 and Void in the Southern area of 140 Ha with drainage RL 11 to be used as a source of irrigation for rice fields and become the location of the planned infrastructure development of Solar Power Plants. Descriptive and quantitative data analysis is assisted using Geovia Minex, X Pac, Autocad Land Desktop, and Microsoft Excel software. Void optimization efforts yield; in the North void, the amount of material to be moved is 1,048,905 LCM, and the South void requires 2,346,460 LCM so the total volume of OB needed is 3,395,365 LCM. The work time is 15 months (1 year 3 months) using the main tool 3 units of PC 400 for excavation and 9 units of HINO FM260 for transportation with a total required cost of US$ 7,630,777
东加里曼丹省巨模寺煤矿计划的优化作用
本研究旨在通过工程材料处理来优化空洞功能,以便在开采后阶段,预计北部40公顷的空洞(排水RL 20)和南部140公顷的空洞(排水RL 11)将作为稻田灌溉的来源,并成为规划的太阳能发电厂基础设施发展的位置。使用Geovia Minex, X Pac, Autocad Land Desktop和Microsoft Excel软件辅助进行描述性和定量数据分析。空穴优化成果;在北部空洞需要移动的物料量为1,048,905 LCM,而南部空洞需要移动的物料量为2,346,460 LCM,因此所需OB的总体积为3,395,365 LCM。工作时间为15个月(1年3个月),使用主要工具3台PC 400进行挖掘,9台HINO FM260进行运输,总费用为7,630,777美元
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信