Efektifitas Pembesian pada Proyek Panbill Mall menggunakan Bar Bending Schedule SNI-2847-2019, BS-8666-2005, dan Linear Programming

Derwin Arifin, A. Saputra, Amanatullah Savitri
{"title":"Efektifitas Pembesian pada Proyek Panbill Mall menggunakan Bar Bending Schedule SNI-2847-2019, BS-8666-2005, dan Linear Programming","authors":"Derwin Arifin, A. Saputra, Amanatullah Savitri","doi":"10.30737/jurmateks.v5i1.2588","DOIUrl":null,"url":null,"abstract":"The need for the amount of iron in a structural element becomes an important part of attention. Improper planning for iron needs will result in uncontrolled or excessive residual iron material. The effectiveness of iron is needed to minimize the amount of residual iron produced. This study aims to carry out the effectiveness of steel usage on the Panbill Mall Project based on the Bar Bending Schedule. The Bar Bending Schedule is carried out using the SNI-2847-2019, BS-8666-2005, and Linear Programming methods. The review of the reinforcement was carried out on the foundation structural elements (PC1 and PC2). Some data were collected such as steel length, quantity, and bending shape based on the structural drawings of the Panbill Mall project. From this data, calculations are made based on the Bar Bending Schedule with different references and methods. So that the minimum amount of iron will be obtained. Based on the results of the calculations and analysis carried out, it can be concluded that the Linear Programming method is the most effective method in calculating the iron based on the Bar Bending Schedule. Based on the results of residual iron calculated using SNI-2847-2019 and BS-8666-2005, the Linear Programming Method is more effective in reducing iron residues by 76% on P1C foundations and 92% on P2C foundations. These results can be used as a reference in calculating the iron based on the bar Bending Schedule effectively.","PeriodicalId":173188,"journal":{"name":"Jurnal Manajemen Teknologi & Teknik Sipil","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Manajemen Teknologi & Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30737/jurmateks.v5i1.2588","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The need for the amount of iron in a structural element becomes an important part of attention. Improper planning for iron needs will result in uncontrolled or excessive residual iron material. The effectiveness of iron is needed to minimize the amount of residual iron produced. This study aims to carry out the effectiveness of steel usage on the Panbill Mall Project based on the Bar Bending Schedule. The Bar Bending Schedule is carried out using the SNI-2847-2019, BS-8666-2005, and Linear Programming methods. The review of the reinforcement was carried out on the foundation structural elements (PC1 and PC2). Some data were collected such as steel length, quantity, and bending shape based on the structural drawings of the Panbill Mall project. From this data, calculations are made based on the Bar Bending Schedule with different references and methods. So that the minimum amount of iron will be obtained. Based on the results of the calculations and analysis carried out, it can be concluded that the Linear Programming method is the most effective method in calculating the iron based on the Bar Bending Schedule. Based on the results of residual iron calculated using SNI-2847-2019 and BS-8666-2005, the Linear Programming Method is more effective in reducing iron residues by 76% on P1C foundations and 92% on P2C foundations. These results can be used as a reference in calculating the iron based on the bar Bending Schedule effectively.
结构元素对铁含量的需求成为人们关注的一个重要部分。对铁的需求规划不当将导致铁的残留失控或过量。需要铁的有效性,以尽量减少产生的残余铁的量。本研究旨在研究基于钢筋弯曲计划的Panbill Mall项目钢材使用的有效性。采用sn -2847-2019、BS-8666-2005和线性规划方法编制棒材弯曲工艺流程。对基础结构单元(PC1和PC2)进行加固复核。根据Panbill Mall项目的结构图纸,收集了钢材长度、数量、弯曲形状等数据。根据这些数据,用不同的参考文献和方法,根据棒材弯曲规程进行了计算。这样就能得到最少量的铁。根据计算和分析的结果,可以得出线性规划法是计算基于棒材弯曲计划的铁的最有效方法。基于SNI-2847-2019和BS-8666-2005的残铁计算结果,线性规划方法在P1C基础上的残铁减少率为76%,在P2C基础上的残铁减少率为92%。这些结果可为有效地计算基于棒材弯曲规程的铁量提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信