{"title":"Time –Cost Trade-off Optimal Approaches","authors":"H. Golpîra, Heibatolah Sadeghi, S. Khan","doi":"10.1007/978-3-030-81123-5_5","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":255000,"journal":{"name":"Application of Mathematics and Optimization in Construction Project Management","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Application of Mathematics and Optimization in Construction Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-030-81123-5_5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}