A simulation model for equipment selection in a steel plant

P. Nassau
{"title":"A simulation model for equipment selection in a steel plant","authors":"P. Nassau","doi":"10.1145/1102838.1102843","DOIUrl":null,"url":null,"abstract":"A simulation model was developed to determine the optimal policy for utilization and replacement of moving equipment in a steel plant. Specifically, this paper deals with the problem of slag removal in a melt-shop composed of a batch of five electric-arc furnaces. The environment of high temperatures in which service has to take place leads to conditions of frequent equipment break-down and a dynamic rescheduling of activities, which makes the use of simulation a necessity. One important feature that was included in the model was the process of \"aging\", that is, that service time is a function of the number of minutes that the slag has been waiting for its removal.","PeriodicalId":138785,"journal":{"name":"ACM Sigsim Simulation Digest","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1979-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACM Sigsim Simulation Digest","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1102838.1102843","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

A simulation model was developed to determine the optimal policy for utilization and replacement of moving equipment in a steel plant. Specifically, this paper deals with the problem of slag removal in a melt-shop composed of a batch of five electric-arc furnaces. The environment of high temperatures in which service has to take place leads to conditions of frequent equipment break-down and a dynamic rescheduling of activities, which makes the use of simulation a necessity. One important feature that was included in the model was the process of "aging", that is, that service time is a function of the number of minutes that the slag has been waiting for its removal.
某钢厂设备选型的仿真模型
为确定某钢厂移动设备的最优利用和更换策略,建立了仿真模型。具体来说,本文研究了一个由五台电弧炉组成的熔池车间的除渣问题。必须在高温环境中进行服务,导致设备频繁故障和动态重新安排活动的条件,这使得使用模拟是必要的。模型中包含的一个重要特征是“老化”过程,即使用时间是炉渣等待清除的分钟数的函数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信