Techno-Economic Analysis of Rooftop Solar PV System by Variation in PV Module Capacity

Y. Sharma, B. Saxena, Sanjeev Mishra
{"title":"Techno-Economic Analysis of Rooftop Solar PV System by Variation in PV Module Capacity","authors":"Y. Sharma, B. Saxena, Sanjeev Mishra","doi":"10.1109/ICPEDC47771.2019.9036479","DOIUrl":null,"url":null,"abstract":"The target set by India for installing solar photovoltaic power plants is 100 GW. Out of this, 40 GW is to be complimented by rooftop solar photovoltaic power plants. These targets are to be achieved by year 2022. But, till 31st May 2019, only 4.91% of the target set for rooftop solar photovoltaic is achieved. Despite the growth in renewable sector, achieving that target is still a challenge. This paper discusses the technical and economical analysis of a rooftop solar PV plant of 300 kW installed at Rajasthan Technical University, Kota, India. The study reveals the importance of simulating a solar PV power plant by using software before installation. HOMER software is used for the simulation of power plant. It is found that if high power rating modules are used instead of the presently installed modules, 61,608 kWh/year of additional energy can be generated. Levelized cost of electricity (LCOE) of the system (including energy imported from the grid supply) comes out to be ₹6.39/kWh, as renewable fraction is only 25.5% of the total load demand.","PeriodicalId":426923,"journal":{"name":"2019 2nd International Conference on Power and Embedded Drive Control (ICPEDC)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 2nd International Conference on Power and Embedded Drive Control (ICPEDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPEDC47771.2019.9036479","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

The target set by India for installing solar photovoltaic power plants is 100 GW. Out of this, 40 GW is to be complimented by rooftop solar photovoltaic power plants. These targets are to be achieved by year 2022. But, till 31st May 2019, only 4.91% of the target set for rooftop solar photovoltaic is achieved. Despite the growth in renewable sector, achieving that target is still a challenge. This paper discusses the technical and economical analysis of a rooftop solar PV plant of 300 kW installed at Rajasthan Technical University, Kota, India. The study reveals the importance of simulating a solar PV power plant by using software before installation. HOMER software is used for the simulation of power plant. It is found that if high power rating modules are used instead of the presently installed modules, 61,608 kWh/year of additional energy can be generated. Levelized cost of electricity (LCOE) of the system (including energy imported from the grid supply) comes out to be ₹6.39/kWh, as renewable fraction is only 25.5% of the total load demand.
基于组件容量变化的屋顶太阳能光伏系统技术经济分析
印度为安装太阳能光伏电站设定的目标是100吉瓦。其中,40吉瓦将由屋顶太阳能光伏发电厂补充。这些目标将在2022年之前实现。但是,截至2019年5月31日,仅实现了4.91%的屋顶太阳能光伏目标。尽管可再生能源领域有所增长,但实现这一目标仍然是一个挑战。本文讨论了安装在印度哥打拉贾斯坦技术大学的300千瓦屋顶太阳能光伏电站的技术和经济分析。该研究揭示了在安装前使用软件模拟太阳能光伏电站的重要性。采用HOMER软件对电厂进行仿真。研究发现,如果使用高功率模块代替目前安装的模块,每年可产生61,608千瓦时的额外能源。该系统的平准化电力成本(LCOE)(包括从电网进口的能源)为₹6.39/千瓦时,可再生部分仅占总负荷需求的25.5%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信