{"title":"Get in step with synchronization","authors":"D. Ransom","doi":"10.1109/ICPS.2014.6839179","DOIUrl":null,"url":null,"abstract":"This paper presents a review of power-system synchronization. When two sources are paralleled, it is crucial to close the interconnecting circuit breaker when both sources are in voltage, frequency, and phase coincidence. Operators can synchronize manually, or use the latest, state-of-the-art autosynchronizers (ANSI/IEEE device 25A) [1] and sync-check relays (ANSIIIEEE device 25) to automate closing. Generator and bus synchronization share most principles, with some important differences for each type of synchronization. For generation plants, closing manually or applying an automatic synchronizer depends a lot on the plant configuration and operating mode. For bus-line applications, synchronizing depends on power-system stiffness, motor loads, and whether a wye-delta transformer is between the line and bus. Methods for attaining proper synch-check and fast synchronization are discussed.","PeriodicalId":330343,"journal":{"name":"2014 IEEE/IAS 50th Industrial & Commercial Power Systems Technical Conference","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE/IAS 50th Industrial & Commercial Power Systems Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.2014.6839179","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper presents a review of power-system synchronization. When two sources are paralleled, it is crucial to close the interconnecting circuit breaker when both sources are in voltage, frequency, and phase coincidence. Operators can synchronize manually, or use the latest, state-of-the-art autosynchronizers (ANSI/IEEE device 25A) [1] and sync-check relays (ANSIIIEEE device 25) to automate closing. Generator and bus synchronization share most principles, with some important differences for each type of synchronization. For generation plants, closing manually or applying an automatic synchronizer depends a lot on the plant configuration and operating mode. For bus-line applications, synchronizing depends on power-system stiffness, motor loads, and whether a wye-delta transformer is between the line and bus. Methods for attaining proper synch-check and fast synchronization are discussed.