{"title":"Runoff and soil erosion response to clear cutting period of acacia plantation in a headwater mountain of Vietnam","authors":"B. Dũng, Thanh Do Thi Kim","doi":"10.33292/areste.v1i1.4","DOIUrl":null,"url":null,"abstract":"This study evaluated the responses of runoff and soil erosion to a clear-cutting period of Acacia plantation in a headwater mountain. Two plots with 15m2 (3m width*5m length) were installed in a headwater mountain of Hoa Binh, Vietnam. Plot 1 remained untreated as the control plot, while plot 2 was clear-cutting in March 2019. Runoff and soil erosion was observed from April to September 2018 for the pre-cutting period with 55 storm events and from March to May 2019 for the post- cutting period with 15 storms-events. Observed data was examined the effects of the cutting period by using paired-plot analysis that compared the control plot and the treatment plot. The main results included: (1) Surface runoff after clear-cutting increased statistical significantly from 0.18 mm storm-1 (corresponding to 0.38 %) to 0.26 mm storm-1 (corresponding to 0.56 %). Paired- plot analysis showed the increase of surface flow is 81.14% after cutting; (2) Soil erosion increased statistically significant after clear-cutting from 228.44 g/storm to 309.27 g/storm on average, the amount of soil erosion due to treatment effect increased 33.1 %. The increase of runoff and soil erosion is quite high after the cutting period. This suggests that plantation management practices to control runoff and soil erosion in the headwater basin are necessary for Vietnam.","PeriodicalId":237717,"journal":{"name":"Applied Research in Science and Technology","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Research in Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33292/areste.v1i1.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This study evaluated the responses of runoff and soil erosion to a clear-cutting period of Acacia plantation in a headwater mountain. Two plots with 15m2 (3m width*5m length) were installed in a headwater mountain of Hoa Binh, Vietnam. Plot 1 remained untreated as the control plot, while plot 2 was clear-cutting in March 2019. Runoff and soil erosion was observed from April to September 2018 for the pre-cutting period with 55 storm events and from March to May 2019 for the post- cutting period with 15 storms-events. Observed data was examined the effects of the cutting period by using paired-plot analysis that compared the control plot and the treatment plot. The main results included: (1) Surface runoff after clear-cutting increased statistical significantly from 0.18 mm storm-1 (corresponding to 0.38 %) to 0.26 mm storm-1 (corresponding to 0.56 %). Paired- plot analysis showed the increase of surface flow is 81.14% after cutting; (2) Soil erosion increased statistically significant after clear-cutting from 228.44 g/storm to 309.27 g/storm on average, the amount of soil erosion due to treatment effect increased 33.1 %. The increase of runoff and soil erosion is quite high after the cutting period. This suggests that plantation management practices to control runoff and soil erosion in the headwater basin are necessary for Vietnam.
越南源山金合欢人工林清伐期径流和土壤侵蚀响应
本研究评价了水源山金合欢人工林采伐期径流和土壤侵蚀对采伐期的响应。两个15平方米(3米宽5米长)的地块安装在越南和平的源头山上。1号地块作为对照地块未进行处理,2号地块于2019年3月进行了砍伐。在2018年4月至9月,采伐前发生了55次暴雨,在2019年3月至5月,采伐后发生了15次暴雨。观察到的数据通过对比对照图和处理图的配对分析来检验刈割期的影响。主要结果包括:(1)采伐后地表径流量从0.18 mm storm-1(0.38%)增加到0.26 mm storm-1(0.56%)。配对图分析表明,切割后地表流量增加81.14%;(2)采伐后土壤侵蚀量从228.44 g/storm增加到309.27 g/storm,处理后土壤侵蚀量增加了33.1%。采伐期后径流量和土壤流失量增幅较大。这表明越南有必要采取人工林管理措施来控制源头流域的径流和土壤侵蚀。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信