Penekanan Susut Non-Teknis dengan cara Optimalisasi Pelaksanaan P2TL di PT-PLN-(Persero)-ULP-Indarung

Arieyansyah Arieyansyah, Riki Mukhaiyar
{"title":"Penekanan Susut Non-Teknis dengan cara Optimalisasi Pelaksanaan P2TL di PT-PLN-(Persero)-ULP-Indarung","authors":"Arieyansyah Arieyansyah, Riki Mukhaiyar","doi":"10.31933/RRJ.V3I4.414","DOIUrl":null,"url":null,"abstract":"Loss is the amount of energy lost in the process of distributing electrical energy from the substation to the consumer. PT PLN (Persero) ULP Indarung's losses in semester 1 of 2020 were still quite high with a total of 10,314,804 kWh, while non-technical losses contributed 30.76% kWh of the total or equal to 3,173,508 kWh. Subscription Data Needs Attention (DLPD) to obtain Operational Targets (SO) and Operational Targets (TO), establish good communication with internal (Outsourcing) and External (community) parties to obtain accurate Operational Targets (TO), and implement P2TL SOPs in the field. After P2TL optimization efforts were made, the total losses in semester 1 of 2021 were 8,108,489 kWh, while non-technical losses in semester 1 of 2021 contributed 4.03% of the total or equal to 326,762 kWh. Therefore the P2TL optimization effort is said to be successful because it can reduce non-technical losses from 3,173,804 kWh to 326,762 kWh, with P2TL itself contributing 2,020,376 kWh.","PeriodicalId":333433,"journal":{"name":"Ranah Research : Journal of Multidisciplinary Research and Development","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ranah Research : Journal of Multidisciplinary Research and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31933/RRJ.V3I4.414","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Loss is the amount of energy lost in the process of distributing electrical energy from the substation to the consumer. PT PLN (Persero) ULP Indarung's losses in semester 1 of 2020 were still quite high with a total of 10,314,804 kWh, while non-technical losses contributed 30.76% kWh of the total or equal to 3,173,508 kWh. Subscription Data Needs Attention (DLPD) to obtain Operational Targets (SO) and Operational Targets (TO), establish good communication with internal (Outsourcing) and External (community) parties to obtain accurate Operational Targets (TO), and implement P2TL SOPs in the field. After P2TL optimization efforts were made, the total losses in semester 1 of 2021 were 8,108,489 kWh, while non-technical losses in semester 1 of 2021 contributed 4.03% of the total or equal to 326,762 kWh. Therefore the P2TL optimization effort is said to be successful because it can reduce non-technical losses from 3,173,804 kWh to 326,762 kWh, with P2TL itself contributing 2,020,376 kWh.
P2TL在ppln -(Persero)- psero - young - indarung中积极执行P2TL的技术压制
损耗是指电能从变电站输送到用户的过程中所损失的能量。PT PLN (Persero) ULP Indarung在2020年第一季度的损失仍然相当高,总计10,314,804千瓦时,而非技术损失占总损失的30.76%,相当于3,173,508千瓦时。订阅数据需要关注(DLPD),获取运营目标(SO)和运营目标(to),与内部(Outsourcing)和外部(community)各方建立良好的沟通,获取准确的运营目标(to),并在现场实施P2TL sop。经过P2TL优化后,2021年第1学期的总损耗为8,108,489 kWh,而2021年第1学期的非技术损耗占总损耗的4.03%,为326,762 kWh。因此,P2TL优化工作被认为是成功的,因为它可以将非技术损失从3,173,804千瓦时减少到326,762千瓦时,P2TL本身贡献了2,020,376千瓦时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信