Assembly line balancing with work zone and station load time windows constraints

R. Pastor, A. Corominas
{"title":"Assembly line balancing with work zone and station load time windows constraints","authors":"R. Pastor, A. Corominas","doi":"10.1109/ISATP.1999.782999","DOIUrl":null,"url":null,"abstract":"This paper presents the solution of a real problem concerning assembly line balancing with several types of incompatibility, and with the constraint that, for a given number of stations, the load of the stations must be located within a time window that is predetermined according to the average load time. The problem is solved by a two-phase heuristic solution procedure: a truncated dynamic programming procedure and an improvement phase, which involves local optimization and tabu search procedures.","PeriodicalId":326575,"journal":{"name":"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1999-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISATP.1999.782999","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper presents the solution of a real problem concerning assembly line balancing with several types of incompatibility, and with the constraint that, for a given number of stations, the load of the stations must be located within a time window that is predetermined according to the average load time. The problem is solved by a two-phase heuristic solution procedure: a truncated dynamic programming procedure and an improvement phase, which involves local optimization and tabu search procedures.
装配线平衡与工作区域和工位负载时间窗口的限制
本文给出了一个实际问题的求解方法,该问题涉及几种不相容的装配线平衡问题,该问题的约束条件是,对于给定数量的工位,工位的负载必须位于根据平均负载时间预先确定的时间窗口内。采用两阶段启发式求解过程:截断动态规划过程和改进阶段,改进阶段涉及局部优化和禁忌搜索过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信