Lannion downstream bridge over the Léguer River

Ambra Chioccariello, M. Chaabouni, T. Lavigne
{"title":"Lannion downstream bridge over the Léguer River","authors":"Ambra Chioccariello, M. Chaabouni, T. Lavigne","doi":"10.2749/ghent.2021.2025","DOIUrl":null,"url":null,"abstract":"With a total length of about 210 m, the new Lannion downstream bridge will cross the river with an “S” shape path. Deck will be made up of a steel and concrete composite box girder. To reduce impacts on the river flow, only a pier will be placed in the riverbed. It consists of a steel tetrapod formed by four legs, embedded on the bottom plate of the box and designed as extensions of box’s webs. Crutches meet on a metal base resting on a reinforced concrete pier. The architectural design consists of a light structure characterized by natural and maritime shapes: an homage to the site’s history and landscape.","PeriodicalId":162435,"journal":{"name":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Congress, Ghent 2021: Structural Engineering for Future Societal Needs","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/ghent.2021.2025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

With a total length of about 210 m, the new Lannion downstream bridge will cross the river with an “S” shape path. Deck will be made up of a steel and concrete composite box girder. To reduce impacts on the river flow, only a pier will be placed in the riverbed. It consists of a steel tetrapod formed by four legs, embedded on the bottom plate of the box and designed as extensions of box’s webs. Crutches meet on a metal base resting on a reinforced concrete pier. The architectural design consists of a light structure characterized by natural and maritime shapes: an homage to the site’s history and landscape.
兰尼昂下游的一座桥,横跨莱姆格尔河
新的兰尼翁下游大桥全长约210米,将以“S”形路径穿越河流。甲板将由钢和混凝土组合箱梁组成。为了减少对河水的影响,在河床上只建一个桥墩。它由一个由四条腿组成的钢四足组成,嵌在盒子的底板上,设计成盒子腹板的延伸。两根拐杖在钢筋混凝土桥墩上的金属底座上相遇。建筑设计由一个以自然和海洋形状为特征的轻结构组成:向基地的历史和景观致敬。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信