Faktor Pendukung PT Rayon Utama Makmur dalam Penghentian Proses Produksi Berdasarkan UU No. 11 Tahun 2020 tentang Cipta Kerja

Cosmas Primvance Daega Arya Putra, W. Waluyo, Rosita Candrakirana
{"title":"Faktor Pendukung PT Rayon Utama Makmur dalam Penghentian Proses Produksi Berdasarkan UU No. 11 Tahun 2020 tentang Cipta Kerja","authors":"Cosmas Primvance Daega Arya Putra, W. Waluyo, Rosita Candrakirana","doi":"10.56721/pledoi.v2i1.176","DOIUrl":null,"url":null,"abstract":"The development of the industrial sector in Indonesia not only has a positive impact but also has a negative impact, especially in terms of environmental pollution. Environmental pollution that occurs can disturb and unsettle the community. The waste produced by PT Rayon Utama Makmur creates a pungent odor that is disturbing and disturbing the comfort of the community, especially those located behind the PT Rayon Utama Makmur factory. The standard criteria for environmental damage have been regulated in laws and regulations. Based on Law Number 11 of 2020 concerning Job Creation, the matter regarding PT Rayon Utama Makmur has been transferred to the Ministry of Environment and Forestry of the Republic of Indonesia so that the Sukoharjo Regency Environmental Service no longer has further authority regarding the continuation of this case. This study aims to analyze the factors that influenced PT Rayon Utama Makmur to finally decide to stop its production process and what PT Rayon Utama Makmur should do to be able to correct its mistakes. In this study, the authors used a normative empirical research method, which is a research method that combines elements of normative law supported by material data or empirical elements. Furthermore, good will and effort from PT Rayon Utama Makmur are needed to improve the production process and waste disposal process, because the relationship between PT Rayon Utama Makmur and local residents has deteriorated. The Central Government and Regional Governments also need to work together to review the way PT Rayon Utama Makmur treats the remaining production waste.","PeriodicalId":136750,"journal":{"name":"PLEDOI (Jurnal Hukum dan Keadilan)","volume":"82 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PLEDOI (Jurnal Hukum dan Keadilan)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56721/pledoi.v2i1.176","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The development of the industrial sector in Indonesia not only has a positive impact but also has a negative impact, especially in terms of environmental pollution. Environmental pollution that occurs can disturb and unsettle the community. The waste produced by PT Rayon Utama Makmur creates a pungent odor that is disturbing and disturbing the comfort of the community, especially those located behind the PT Rayon Utama Makmur factory. The standard criteria for environmental damage have been regulated in laws and regulations. Based on Law Number 11 of 2020 concerning Job Creation, the matter regarding PT Rayon Utama Makmur has been transferred to the Ministry of Environment and Forestry of the Republic of Indonesia so that the Sukoharjo Regency Environmental Service no longer has further authority regarding the continuation of this case. This study aims to analyze the factors that influenced PT Rayon Utama Makmur to finally decide to stop its production process and what PT Rayon Utama Makmur should do to be able to correct its mistakes. In this study, the authors used a normative empirical research method, which is a research method that combines elements of normative law supported by material data or empirical elements. Furthermore, good will and effort from PT Rayon Utama Makmur are needed to improve the production process and waste disposal process, because the relationship between PT Rayon Utama Makmur and local residents has deteriorated. The Central Government and Regional Governments also need to work together to review the way PT Rayon Utama Makmur treats the remaining production waste.
根据2020年第11号劳动法,PT Rayon在生产过程中最重要的推动者正在蓬勃发展
印度尼西亚工业部门的发展既有积极的影响,也有消极的影响,特别是在环境污染方面。发生的环境污染会扰乱和扰乱社区。PT Rayon Utama Makmur生产的废物产生一种刺鼻的气味,令人不安,扰乱了社区的舒适,特别是位于PT Rayon Utama Makmur工厂后面的社区。环境损害标准在法律法规中有明确规定。根据关于创造就业机会的2020年第11号法律,有关Rayon Utama Makmur女士的案件已移交给印度尼西亚共和国环境和林业部,因此苏科哈霍县环境服务局不再对此案的继续审理拥有进一步的权力。本研究旨在分析影响PT Rayon Utama Makmur最终决定停止生产过程的因素,以及PT Rayon Utama Makmur应该做些什么来纠正错误。在本研究中,作者采用了规范性实证研究方法,即以实物数据或实证要素为支撑,结合规范性法要素的研究方法。此外,需要PT Rayon Utama Makmur的善意和努力来改善生产过程和废物处理过程,因为PT Rayon Utama Makmur与当地居民之间的关系已经恶化。中央政府和地方政府还需要共同审查PT Rayon Utama Makmur处理剩余生产废物的方式。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信