{"title":"Integrated simulation approach for assessment of performance in construction projects: A system-of-systems framework","authors":"Jin Zhu, A. Mostafavi","doi":"10.1109/WSC.2014.7020163","DOIUrl":null,"url":null,"abstract":"This research proposes and tests an integrated framework for bottom-up simulation of performance in construction projects. The proposed framework conceptualizes construction projects as systems-of-systems in which the abstraction and micro-simulation of dynamic behaviors are investigated at the base-level consisting of the following elements: human agents, information, and resources. The application of the proposed framework is demonstrated in a numerical example related to a tunneling project. The findings highlight the capability of the proposed framework in providing an integrated approach for bottom-up simulation of performance in construction projects.","PeriodicalId":446873,"journal":{"name":"Proceedings of the Winter Simulation Conference 2014","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Winter Simulation Conference 2014","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2014.7020163","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
This research proposes and tests an integrated framework for bottom-up simulation of performance in construction projects. The proposed framework conceptualizes construction projects as systems-of-systems in which the abstraction and micro-simulation of dynamic behaviors are investigated at the base-level consisting of the following elements: human agents, information, and resources. The application of the proposed framework is demonstrated in a numerical example related to a tunneling project. The findings highlight the capability of the proposed framework in providing an integrated approach for bottom-up simulation of performance in construction projects.