{"title":"HSE Challenges in Thermal Operations Used for Heavy Oil Recovery","authors":"A. Qabazard, Ghadeer Al-Qattan, Sridhar Raju Ketavarapu, Nadeem Khan","doi":"10.2118/193772-MS","DOIUrl":null,"url":null,"abstract":"\n Lower Faras Heavy Oil Project in Ratqa, North Kuwait of Kuwait Oil Company is one of the Major Projects in the upstream business in the Middle East. Heavy oil production from a large field is a significant challenge and involve process, which are not common for normally well-developed onshore upstream production operations personnel. There shall be a Limited/No Flow from a heavy oil well as the viscosity is high and to ensure extraction of hydrocarbon in a most possible efficient manner, thermal operations (including the steam injection) is the best option available. This additional process and associated equipment, their associated hazards are not available in the conventional oil & gas production.\n Though the option of having a horizontal well with no additional steam/heat given to the reservoir, the flow from such wells can recover hydrocarbons, however it is not feasible for a commercial production. As a result, for commercial production, the reservoir is injected with steam (either cyclic or flooding) to recover the hydrocarbons in the most economical method. The steam injection method comes with a few challenges and the crux of success in Heavy oil production is to manage these hazards.\n There have been several accidents that occurred worldwide in heavy oil production and related experimental activities. The root cause of accidents is generally the lack of awareness during the operation and maintenance activeness of the workforce personnel. Different incidents from world over, from the hazard identification and the operability studies undertaken during the project, suggest the various challenges that are underlying in the heavy oil operations. The challenges had been addressed systematically and design enhancement to enhance the robustness of the systems were considered whilst developing the project.","PeriodicalId":137875,"journal":{"name":"Day 3 Wed, December 12, 2018","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, December 12, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193772-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Lower Faras Heavy Oil Project in Ratqa, North Kuwait of Kuwait Oil Company is one of the Major Projects in the upstream business in the Middle East. Heavy oil production from a large field is a significant challenge and involve process, which are not common for normally well-developed onshore upstream production operations personnel. There shall be a Limited/No Flow from a heavy oil well as the viscosity is high and to ensure extraction of hydrocarbon in a most possible efficient manner, thermal operations (including the steam injection) is the best option available. This additional process and associated equipment, their associated hazards are not available in the conventional oil & gas production. Though the option of having a horizontal well with no additional steam/heat given to the reservoir, the flow from such wells can recover hydrocarbons, however it is not feasible for a commercial production. As a result, for commercial production, the reservoir is injected with steam (either cyclic or flooding) to recover the hydrocarbons in the most economical method. The steam injection method comes with a few challenges and the crux of success in Heavy oil production is to manage these hazards. There have been several accidents that occurred worldwide in heavy oil production and related experimental activities. The root cause of accidents is generally the lack of awareness during the operation and maintenance activeness of the workforce personnel. Different incidents from world over, from the hazard identification and the operability studies undertaken during the project, suggest the various challenges that are underlying in the heavy oil operations. The challenges had been addressed systematically and design enhancement to enhance the robustness of the systems were considered whilst developing the project.
稠油热采作业的HSE挑战
位于科威特北部Ratqa的Lower Faras重油项目是科威特石油公司在中东上游业务的主要项目之一。大型油田的稠油开采是一个巨大的挑战,涉及到很多过程,这对于通常发达的陆上上游生产作业人员来说并不常见。稠油井由于粘度高,应限流或无流,为了确保以最有效的方式提取碳氢化合物,热操作(包括蒸汽注入)是最佳选择。这种额外的工艺和相关设备及其相关的危险在常规油气生产中是不存在的。虽然可以选择不向储层提供额外蒸汽/热量的水平井,但从这种井中流出的流体可以回收碳氢化合物,但对于商业生产来说是不可行的。因此,在商业生产中,采用最经济的方法向储层注入蒸汽(循环或驱油)以回收碳氢化合物。注汽方法存在一些挑战,稠油开采成功的关键在于控制这些风险。在世界范围内,稠油生产及相关实验活动中发生了多起事故。事故发生的根本原因,一般是作业人员在运维过程中意识不足,积极性不高。来自世界各地的不同事故,从危险识别到项目期间进行的可操作性研究,都表明了重油作业中潜在的各种挑战。系统地解决了这些挑战,并在开发项目时考虑了增强设计以增强系统的稳健性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信