{"title":"Complexity of Risk Management in Danish Power Transmission Industry: Managing Disregarded and Minor risks","authors":"L. P. Brasen, Torben Tambo","doi":"10.1109/iccakm50778.2021.9357740","DOIUrl":null,"url":null,"abstract":"With Risk being an ever-present concern, the Danish Power Transmission Industry (DPT) is no stranger to the concept. However, with growing complexity in the asset portfolio and an organization that wants to conform with agile methods, the DPT involved in this paper, are facing challenges regarding risk management in asset management activities. Disregarded and minor risks are backlogged and surveyed only once a year and a strong desire to change that fact have arisen in the asset management department. The aim of this study is therefore to examine the literature and investigate the current processes at the DPT, to ensure the development of a solution that can encapsulate and solve the disregarded and minor risks.","PeriodicalId":165854,"journal":{"name":"2021 2nd International Conference on Computation, Automation and Knowledge Management (ICCAKM)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 2nd International Conference on Computation, Automation and Knowledge Management (ICCAKM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/iccakm50778.2021.9357740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

With Risk being an ever-present concern, the Danish Power Transmission Industry (DPT) is no stranger to the concept. However, with growing complexity in the asset portfolio and an organization that wants to conform with agile methods, the DPT involved in this paper, are facing challenges regarding risk management in asset management activities. Disregarded and minor risks are backlogged and surveyed only once a year and a strong desire to change that fact have arisen in the asset management department. The aim of this study is therefore to examine the literature and investigate the current processes at the DPT, to ensure the development of a solution that can encapsulate and solve the disregarded and minor risks.
丹麦输电行业风险管理的复杂性:管理被忽视的和次要的风险
由于风险是一个始终存在的问题,丹麦电力传输行业(DPT)对这个概念并不陌生。然而,随着资产组合日益复杂,以及希望遵循敏捷方法的组织,本文所涉及的DPT面临着资产管理活动中风险管理方面的挑战。被忽视的和较小的风险被积压,每年只调查一次,资产管理部门出现了改变这一事实的强烈愿望。因此,本研究的目的是检查文献并调查DPT的当前流程,以确保开发出能够封装和解决被忽视和次要风险的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信