{"title":"Micro PMU Placement In Distribution Network With Probabilistic Contingencies and Bound Budget","authors":"M. Mukherjee, B. K. Roy","doi":"10.1109/ICEPE50861.2021.9404377","DOIUrl":null,"url":null,"abstract":"This paper envisages a novel proposal for micro-PMU placement in distribution network in a budget constraint environment to gear the single branch outage condition. The objectives of this work are to deploy minimum number of micro-PMUs in distribution network in order to get complete system observability considering channel cost of micro-PMUs for the sake of easing down the economic burden, to evaluate the total cost and to propose an algorithm serving situational coverage of single branch outage condition. In a reserved budget circumstance aiming at subduing the number of extra micro-PMUs under single branch outage condition, reliability of system components under normal and adverse weather conditions are introduced. Probability of unavailability of each branch is computed by Markov chain two state transition model. The probability assessment justifies the number of branches should be taken care off to meet the bound budget environment. An example with evaluation of cost has been provided for IEEE 34 test bus system.","PeriodicalId":250203,"journal":{"name":"2020 3rd International Conference on Energy, Power and Environment: Towards Clean Energy Technologies","volume":"91 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 3rd International Conference on Energy, Power and Environment: Towards Clean Energy Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEPE50861.2021.9404377","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper envisages a novel proposal for micro-PMU placement in distribution network in a budget constraint environment to gear the single branch outage condition. The objectives of this work are to deploy minimum number of micro-PMUs in distribution network in order to get complete system observability considering channel cost of micro-PMUs for the sake of easing down the economic burden, to evaluate the total cost and to propose an algorithm serving situational coverage of single branch outage condition. In a reserved budget circumstance aiming at subduing the number of extra micro-PMUs under single branch outage condition, reliability of system components under normal and adverse weather conditions are introduced. Probability of unavailability of each branch is computed by Markov chain two state transition model. The probability assessment justifies the number of branches should be taken care off to meet the bound budget environment. An example with evaluation of cost has been provided for IEEE 34 test bus system.
具有概率偶然性和有界预算的配电网微PMU配置
本文提出了一种在预算约束环境下配电网中放置微型pmu以适应单支路停电情况的新方案。本文以在配电网中部署最小数量的微型pmu以获得完全的系统可观察性为目标,考虑到微型pmu的通道成本以减轻经济负担,对总成本进行评估,并提出了一种服务于单支路停机情况下的情景覆盖算法。在预留预算的情况下,以控制单支路停电情况下多余的微型pmu数量为目标,介绍了系统组件在正常和恶劣天气条件下的可靠性。利用马尔可夫链二态转移模型计算各分支不可用概率。概率评估证明了分支的数量应该被减少,以满足有限的预算环境。给出了ieee34测试总线系统的成本评估实例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信