{"title":"Switching on by-pass currents during live-line maintenance operations","authors":"J. Lalot","doi":"10.1109/TDCLLM.1993.316241","DOIUrl":null,"url":null,"abstract":"Technical literature about live working has been mainly devoted to problems related to electrical insulation of the network, especially distances to maintain between linesmen and live parts. This paper concentrates on aspects related to current in electrical installations as it may become necessary, during live maintenance, to separate temporarily these installations from the network. Risk analysis results on limiting conditions expressed as maximum current values and/or length of installations which can be worked on are presented.<<ETX>>","PeriodicalId":198668,"journal":{"name":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1993.316241","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Technical literature about live working has been mainly devoted to problems related to electrical insulation of the network, especially distances to maintain between linesmen and live parts. This paper concentrates on aspects related to current in electrical installations as it may become necessary, during live maintenance, to separate temporarily these installations from the network. Risk analysis results on limiting conditions expressed as maximum current values and/or length of installations which can be worked on are presented.<>
在带电维护操作期间接通旁路电流
关于带电工作的技术文献主要致力于与网络电气绝缘有关的问题,特别是维护线路人员与带电部件之间的距离。本文集中讨论与电气装置中的电流有关的方面,因为在现场维护期间,可能需要将这些装置暂时与网络分开。给出了以最大电流值和/或可工作的装置长度表示的极限条件下的风险分析结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信