Optimal scheduling of conveyor belt systems under Critical Peak Pricing

T. Mathaba, X. Xia, Jiangfeng Zhang
{"title":"Optimal scheduling of conveyor belt systems under Critical Peak Pricing","authors":"T. Mathaba, X. Xia, Jiangfeng Zhang","doi":"10.1109/ASSCC.2012.6523285","DOIUrl":null,"url":null,"abstract":"We consider the optimal scheduling of conveyor belts (CB) under Critical Peak Pricing (CPP) tariff. The operation of the belts is optimized using Model Predictive Control (MPC). The paper assesses the effects of MPC prediction horizon and storage size on the load profile, as well as the resulting energy cost. The results show that MPC is suitable for CB scheduling under CPP. The significance of storage size and the length of MPC prediction horizon in achieving cost saving is demonstrated.","PeriodicalId":341348,"journal":{"name":"2012 10th International Power & Energy Conference (IPEC)","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 10th International Power & Energy Conference (IPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASSCC.2012.6523285","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

Abstract

We consider the optimal scheduling of conveyor belts (CB) under Critical Peak Pricing (CPP) tariff. The operation of the belts is optimized using Model Predictive Control (MPC). The paper assesses the effects of MPC prediction horizon and storage size on the load profile, as well as the resulting energy cost. The results show that MPC is suitable for CB scheduling under CPP. The significance of storage size and the length of MPC prediction horizon in achieving cost saving is demonstrated.
临界峰值定价下输送带系统的最优调度
研究了临界峰值定价(CPP)下输送带的最优调度问题。采用模型预测控制(MPC)对皮带的运行进行优化。本文评估了MPC预测范围和存储规模对负荷分布的影响,以及由此产生的能源成本。结果表明,MPC算法适用于CPP下的CB调度。论证了存储空间大小和MPC预测层长度对实现成本节约的重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信