{"title":"Determination of operating reserve requirements considering geographical distribution of wind power plants","authors":"Doğan Gezer, Abdullah Nadar, C. Şahin, N. Ozay","doi":"10.1109/ICCEP.2011.6036395","DOIUrl":null,"url":null,"abstract":"Transmission System Operators (TSOs) in power systems have conventional methods for determining the amount of required operating reserves against load variations and generation outages. With the increase in penetration level of renewable energy resources, uncertainties in the power output of these types of power plants should also be considered by TSOs. Since the output of these types of power plants could not be estimated accurately, the reserve that should be kept for proper operation of power system could be determined with probabilistic approach. In this paper, standard deviation and Weibull distribution are used to estimate the amount of operating reserve required for wind power plants. Also, in order to investigate the effect of geographical distribution of wind power plants, the outputs of different wind power plants in different locations have been obtained.","PeriodicalId":403158,"journal":{"name":"2011 International Conference on Clean Electrical Power (ICCEP)","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Clean Electrical Power (ICCEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCEP.2011.6036395","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Transmission System Operators (TSOs) in power systems have conventional methods for determining the amount of required operating reserves against load variations and generation outages. With the increase in penetration level of renewable energy resources, uncertainties in the power output of these types of power plants should also be considered by TSOs. Since the output of these types of power plants could not be estimated accurately, the reserve that should be kept for proper operation of power system could be determined with probabilistic approach. In this paper, standard deviation and Weibull distribution are used to estimate the amount of operating reserve required for wind power plants. Also, in order to investigate the effect of geographical distribution of wind power plants, the outputs of different wind power plants in different locations have been obtained.
考虑风力发电厂地理分布的运行储备要求的确定
电力系统中的输电系统运营商(tso)有传统的方法来确定针对负载变化和发电中断所需的运行储备量。随着可再生能源渗透水平的提高,tso也应考虑这类电厂输出功率的不确定性。由于这类电厂的出力无法准确估计,因此可以采用概率方法确定电力系统正常运行所需的备用电量。本文采用标准差和威布尔分布来估计风电场所需的运行储备量。此外,为了研究风电场地理分布的影响,我们获得了不同地点不同风电场的输出。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信