A Case Study on the Multistage LED Packaging and Testing Scheduling Problem

Tien-Hsi Chuang, W. Chu, H. Lin, Chia Yang Hung
{"title":"A Case Study on the Multistage LED Packaging and Testing Scheduling Problem","authors":"Tien-Hsi Chuang, W. Chu, H. Lin, Chia Yang Hung","doi":"10.1109/IACSIT-SC.2009.123","DOIUrl":null,"url":null,"abstract":"Light-emitting diode (LED) industry will play an important role in the high-tech industry. At present, around the world promote energy-saving by reducing carbon. LED bulb could save more electricity than regular bulb, so the European Union from 2009 until 2012 will gradually replace energy-consuming bulbs and then be completely banned. A wide range of LED application, such as: the automotive industry, communications, information industry, with the signal display billboards and so on. LED industry is expected to be the next emerging industries. This study would focus on machine scheduling problem for LED packaging and testing factory. The light-emitting diodes packaging and testing scheduling problem (LEDPTSP) is a variation of the complex flow-shop scheduling problem, which is also a generalization of the classical flow batch process problem, and the identical parallel machine problem. In this paper, we present a case study on the LEDPTSP, which is taken from a final packaging and testing shop floor in an LED factory. For the LEDPTSP case investigated, the jobs are clustered by their product types, which are processed on groups of parallel machines at various process stages following the manufacturing sequence, which must be completed before the due dates. The job processing time depends on the product type, and the machine setup time is sequentially dependent on the orders of jobs processed. The objective in the case is to seek a LEDPTS with minimum total machine workload. The LEDPTSP involves serial-processing stage, job clusters, due dates, machine capacity, and sequence dependent setup time, it is more difficult to solve than the classical flow-shop scheduling problem. The LEDPTSP is formulated as in integer programming problem and the problem solved using the powerful CPLEX with effective implementation strategies.","PeriodicalId":286158,"journal":{"name":"2009 International Association of Computer Science and Information Technology - Spring Conference","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Association of Computer Science and Information Technology - Spring Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IACSIT-SC.2009.123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Light-emitting diode (LED) industry will play an important role in the high-tech industry. At present, around the world promote energy-saving by reducing carbon. LED bulb could save more electricity than regular bulb, so the European Union from 2009 until 2012 will gradually replace energy-consuming bulbs and then be completely banned. A wide range of LED application, such as: the automotive industry, communications, information industry, with the signal display billboards and so on. LED industry is expected to be the next emerging industries. This study would focus on machine scheduling problem for LED packaging and testing factory. The light-emitting diodes packaging and testing scheduling problem (LEDPTSP) is a variation of the complex flow-shop scheduling problem, which is also a generalization of the classical flow batch process problem, and the identical parallel machine problem. In this paper, we present a case study on the LEDPTSP, which is taken from a final packaging and testing shop floor in an LED factory. For the LEDPTSP case investigated, the jobs are clustered by their product types, which are processed on groups of parallel machines at various process stages following the manufacturing sequence, which must be completed before the due dates. The job processing time depends on the product type, and the machine setup time is sequentially dependent on the orders of jobs processed. The objective in the case is to seek a LEDPTS with minimum total machine workload. The LEDPTSP involves serial-processing stage, job clusters, due dates, machine capacity, and sequence dependent setup time, it is more difficult to solve than the classical flow-shop scheduling problem. The LEDPTSP is formulated as in integer programming problem and the problem solved using the powerful CPLEX with effective implementation strategies.
多阶段LED封装测试调度问题的实例研究
发光二极管(LED)产业将在高新技术产业中发挥重要作用。目前,世界各地都在提倡通过减少碳排放来节能。LED灯泡比普通灯泡更省电,因此欧盟从2009年到2012年将逐步更换高耗能灯泡,然后全面禁用。LED应用范围广泛,如:汽车行业、通讯、信息行业、用信号显示广告牌等。LED产业有望成为下一个新兴产业。本研究主要针对LED封装测试工厂的机器调度问题。发光二极管封装与测试调度问题(ledpstp)是复杂流水车间调度问题的一种变体,是经典流水批处理问题和同机并行问题的推广。在本文中,我们提出了一个案例研究的ledpstp,这是从一个LED工厂的最终封装和测试车间。对于所调查的LEDPTSP案例,作业按其产品类型聚类,这些作业按照制造顺序在不同工艺阶段的并行机器组上进行加工,这些加工必须在截止日期之前完成。作业处理时间取决于产品类型,机器设置时间依次取决于所处理的作业顺序。本例的目标是寻求具有最小机器总工作负载的LEDPTS。ledpstp涉及到串行处理阶段、作业集群、到期日、机器容量和序列相关的设置时间等问题,比传统的流水车间调度问题更难求解。LEDPTSP被表述为整数规划问题,并使用强大的CPLEX和有效的实现策略来解决问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信