{"title":"Working hours controls methods and increasing its efficiency in the IT company","authors":"M. Seniv, Andriy Sambir, M. Seniv","doi":"10.1109/MEMSTECH.2016.7507546","DOIUrl":null,"url":null,"abstract":"In this paper, methods of controlling of working hours and increasing its efficiency, means: formalized algorithm of software development project modified Gantt chart and software prototype for controlling working hours, are described.","PeriodicalId":102420,"journal":{"name":"2016 XII International Conference on Perspective Technologies and Methods in MEMS Design (MEMSTECH)","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 XII International Conference on Perspective Technologies and Methods in MEMS Design (MEMSTECH)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MEMSTECH.2016.7507546","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In this paper, methods of controlling of working hours and increasing its efficiency, means: formalized algorithm of software development project modified Gantt chart and software prototype for controlling working hours, are described.