Evaluation of the requirements for battery energy storage system to postpone the investment of distribution system

C. Wannasut, K. Hongesombut
{"title":"Evaluation of the requirements for battery energy storage system to postpone the investment of distribution system","authors":"C. Wannasut, K. Hongesombut","doi":"10.1109/ECTICON.2013.6559555","DOIUrl":null,"url":null,"abstract":"This paper proposes the application of the battery energy storage system (BESS) to be installed in the distribution system for the purpose of postponing the investment of the distribution reinforcement in the short term power distribution planning. A study case of the distribution system including the photovoltaic system and the BESS obtained from the Provincial Electricity Authority (PEA) is used to evaluate the requirements of the BESS to be installed in the distribution system by considering four types of loads which are household, small enterprise, industry and other types. It reveals from the study that the installation of the BESS can effectively extend the time of the new distribution line construction.","PeriodicalId":273802,"journal":{"name":"2013 10th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 10th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECTICON.2013.6559555","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

This paper proposes the application of the battery energy storage system (BESS) to be installed in the distribution system for the purpose of postponing the investment of the distribution reinforcement in the short term power distribution planning. A study case of the distribution system including the photovoltaic system and the BESS obtained from the Provincial Electricity Authority (PEA) is used to evaluate the requirements of the BESS to be installed in the distribution system by considering four types of loads which are household, small enterprise, industry and other types. It reveals from the study that the installation of the BESS can effectively extend the time of the new distribution line construction.
蓄电池储能系统需求评估,推迟配电系统投资
本文提出将电池储能系统(BESS)安装在配电系统中,以在短期配电规划中推迟配电加固的投资。本文以省电力局提供的包括光伏系统和BESS在内的配电系统为研究案例,通过考虑家庭、小企业、工业和其他四种类型的负荷,对配电系统中安装BESS的要求进行了评估。研究表明,BESS的安装可以有效地延长新配电线路的建设时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信