Real Time Monitoring of HV Electrical Machines Driving Powerful Pump Aggregates

V. Gueorgiev, P. Rizov
{"title":"Real Time Monitoring of HV Electrical Machines Driving Powerful Pump Aggregates","authors":"V. Gueorgiev, P. Rizov","doi":"10.1109/ELMA.2019.8771515","DOIUrl":null,"url":null,"abstract":"The paper summarizes our experience in building a system for real time monitoring of electrical parameters of powerful pump aggregates. The pumping station supplies cooling water for the main cycle of a power plant and is considered to be a part of the safety systems of the plant. The monitoring of the pump aggregates had to be realized not as an independent system but as a \"patch\" to the existing system for monitoring of the power supply of the station. The measurement capabilities of the existing devices are used. A set of issues with significant impact on practical realization of such a system are discussed here.","PeriodicalId":304248,"journal":{"name":"2019 16th Conference on Electrical Machines, Drives and Power Systems (ELMA)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 16th Conference on Electrical Machines, Drives and Power Systems (ELMA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELMA.2019.8771515","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The paper summarizes our experience in building a system for real time monitoring of electrical parameters of powerful pump aggregates. The pumping station supplies cooling water for the main cycle of a power plant and is considered to be a part of the safety systems of the plant. The monitoring of the pump aggregates had to be realized not as an independent system but as a "patch" to the existing system for monitoring of the power supply of the station. The measurement capabilities of the existing devices are used. A set of issues with significant impact on practical realization of such a system are discussed here.
高压电机驱动大功率泵集料的实时监测
本文总结了建立大功率泵集料电气参数实时监测系统的经验。泵站为电站的主循环提供冷却水,是电站安全系统的组成部分。对泵群的监测不能作为一个独立的系统来实现,而是作为现有电站供电监测系统的一个“补丁”来实现。利用现有设备的测量能力。本文讨论了对该系统的实际实现有重大影响的一系列问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信