ANALISA STRUKTUR PELIMPAH BENDUNGAN LUBUK AMBACANG KECAMATAN HULU KUANTAN KABUPATEN KUANTAN SINGINGI PROVINSI RIAU

Nur Sholawatini, Evi Nur Cahya, Heri Suprijanto
{"title":"ANALISA STRUKTUR PELIMPAH BENDUNGAN LUBUK AMBACANG KECAMATAN HULU KUANTAN KABUPATEN KUANTAN SINGINGI PROVINSI RIAU","authors":"Nur Sholawatini, Evi Nur Cahya, Heri Suprijanto","doi":"10.21776/ub.pengairan.2019.010.02.06","DOIUrl":null,"url":null,"abstract":"Lubuk Ambacang Dam is Roller Compact Concrete Dams and located on the Indragiri River, where the overflow spillway structure also important part of the dam. The purpose of this study is to find out the critical area in the structure when an earthquake occurs. Hydraulic analysis determine the appropriate spillway width. Stability analysis is find out that the planned structure is safe from overturning and sliding. The bearing capacity of the soil is also analyzed to determine whether the soil structure has sufficient capacity to withstand the structure load. Structure load are analyzed in normal conditions, Operating Basic Earthquake (OBE) and Maximum Design Earthquake (MDE). Planned of spillway structure based on the analysis of shell plates using STAADPro V8i application. Result of this study, spillway width is 51 meters which is safe from overturning and sliding. Bearing capacity of the soil is able to withstand the structure stress. The results of STAAD.Pro V8i show that the spillway critical area occurs in the upstream part of spillway when the reservoir water conditions are normal and when the OBE occurs. Whereas the Probable Maximum Flood (PMF) condition, critical area is in chuteway channel. For the stilling basin, the critical area occurs in the upper structure when the conditions are Q100th, 1.25Q100th normal and during an OBE.","PeriodicalId":236511,"journal":{"name":"Jurnal Teknik Pengairan","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Pengairan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.pengairan.2019.010.02.06","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Lubuk Ambacang Dam is Roller Compact Concrete Dams and located on the Indragiri River, where the overflow spillway structure also important part of the dam. The purpose of this study is to find out the critical area in the structure when an earthquake occurs. Hydraulic analysis determine the appropriate spillway width. Stability analysis is find out that the planned structure is safe from overturning and sliding. The bearing capacity of the soil is also analyzed to determine whether the soil structure has sufficient capacity to withstand the structure load. Structure load are analyzed in normal conditions, Operating Basic Earthquake (OBE) and Maximum Design Earthquake (MDE). Planned of spillway structure based on the analysis of shell plates using STAADPro V8i application. Result of this study, spillway width is 51 meters which is safe from overturning and sliding. Bearing capacity of the soil is able to withstand the structure stress. The results of STAAD.Pro V8i show that the spillway critical area occurs in the upstream part of spillway when the reservoir water conditions are normal and when the OBE occurs. Whereas the Probable Maximum Flood (PMF) condition, critical area is in chuteway channel. For the stilling basin, the critical area occurs in the upper structure when the conditions are Q100th, 1.25Q100th normal and during an OBE.
Lubuk Ambacang大坝为碾压混凝土坝,位于因德拉吉里河上,其中溢流溢洪道结构也是大坝的重要组成部分。本研究的目的是找出地震发生时结构中的临界区域。水力分析确定合适的溢洪道宽度。稳定性分析表明,所设计的结构具有抗倾覆和抗滑动的能力。还分析了土的承载力,以确定土结构是否具有足够的承受结构荷载的能力。分析了结构在正常工况、运行基本地震(OBE)和最大设计地震(MDE)下的荷载。利用STAADPro V8i软件对基于壳板分析的溢洪道结构进行规划。研究结果表明,溢洪道宽度为51米,具有抗倾覆、抗滑的安全性能。土的承载能力是能够承受结构应力。STAAD的结果。Pro V8i表明,当水库水条件正常时,溢洪道上游发生溢洪道临界区,溢洪道临界区出现在溢洪道上游。而最大可能洪水(PMF)条件下,关键区域是在溜槽通道内。在q100 %、1.25 q100 %正常条件和出窍时,上部构造出现临界区。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信