Evaluation bid method of railway construction project based on gray situation decision

Guo Zhen-ning
{"title":"Evaluation bid method of railway construction project based on gray situation decision","authors":"Guo Zhen-ning","doi":"10.1109/CECNET.2011.5769241","DOIUrl":null,"url":null,"abstract":"According to the defects of the traditional evaluation bid methods, the essay proposes the evaluation bid methods based on the grey system theory. It establishes a model of grey decision-making and the steps of implementations in evaluation bid of engineering project, and proposes the integrated effect measure algorithm of different polar samples. Also, the essay transforms the qualitative evaluations into the quantitative ones, and then solves the problems that the original methods involved too many human factors and strong subjectivities which influenced the evaluation results. These make the evaluation bid methods improved in comprehensive, rational and scientific respects.","PeriodicalId":375482,"journal":{"name":"2011 International Conference on Consumer Electronics, Communications and Networks (CECNet)","volume":"113 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-04-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Consumer Electronics, Communications and Networks (CECNet)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CECNET.2011.5769241","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

According to the defects of the traditional evaluation bid methods, the essay proposes the evaluation bid methods based on the grey system theory. It establishes a model of grey decision-making and the steps of implementations in evaluation bid of engineering project, and proposes the integrated effect measure algorithm of different polar samples. Also, the essay transforms the qualitative evaluations into the quantitative ones, and then solves the problems that the original methods involved too many human factors and strong subjectivities which influenced the evaluation results. These make the evaluation bid methods improved in comprehensive, rational and scientific respects.
基于灰色形势决策的铁路建设项目评标方法
针对传统评标方法的缺陷,提出了基于灰色系统理论的评标方法。建立了工程项目评标中的灰色决策模型及实施步骤,提出了不同极值样本的综合效果度量算法。并将定性评价转变为定量评价,解决了原有评价方法人为因素过多、主观性强等影响评价结果的问题。这使得评标方法更加全面、合理、科学。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信